What is this project?
EC Transfer of Existing Quartz & Feldspar Mining Project (Production Capacity - 20000 TPA, M.L. No.- 06/1990, Area- 13.1718 Ha.) N/v- Piplaj , Tehsil- Masuda, District- Beawar (Raj.) from Shri M.L. Daga to Shri Naveen Yadav is an approved mining project in Piplaj, Masuda, Ajmer, Rajasthan. The site covers 32.5 acres.
Who is building it?
The applicant is Naveen Yadav.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Aug 2025), as of 27 Nov 2026.
Where is it?
In Piplaj, Masuda, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 32.5 acres.
When was it filed?
The application was filed on 23 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Aug 2025 |
| Application filed | 23 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Naveen Yadav |
| Land area | 32.5 acres (13.2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Piplaj |
| Taluk / tehsil | Masuda |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27403 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 32.5 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 29 have applied within 5 km.
Where it is
Piplaj, Masuda, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Existing Quartz & Feldspar Mining Project, ML No.- 06/1990", with Expansion… — cleared for impact study, 0 m away
- "Reappraisal of the EC granted by DEIAA Ajmer for Quartz and Feldspar Mining… — environmental approval granted, 1.4 km away
- Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity… — environmental approval granted, 1.6 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — environmental approval granted, 2.2 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — withdrawn, 2.2 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — environmental approval granted, 2.6 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — withdrawn, 2.6 km away
- This is a Fresh proposal for "Quartz & Feldspar (Major Mineral) mining… — under environmental review, 2.8 km away
More from Naveen Yadav in Ajmer
- "Existing Quartz & Feldspar Mining Project, ML No.- 06/1990", with Expansion… — cleared for impact study
About this information