Quick answers
What is this project?
Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity 1,98,749 TPA (of Existing Quartz & Feldspar Mining Project, ML No. 232/2006. Area: 4.50 Ha. Village – Sar, Tehsil Beawar, District - Ajmer (Rajasthan) of applicant Sh. Mukul Sharma S/o Sh Gurudutt Sharma is an approved mining project in Sar, Beawar, Ajmer, Rajasthan. The site covers 11.1 acres.
Who is building it?
The applicant is Mukul Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Mar 2025), as of 27 Nov 2026.
Where is it?
In Sar, Beawar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹30 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 8 Mar 2025.
Project details
| Official title | Proposal for Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity 1,98,749 TPA (of Existing Quartz & Feldspar Mining Project, ML No. 232/2006. Area: 4.50 Ha. Village – Sar, Tehsil Beawar, District - Ajmer (Rajasthan) of applicant Sh. Mukul Sharma S/o Sh Gurudutt Sharma |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Mar 2025 |
| Application filed | 8 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mukul Sharma |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Sar |
| Taluk / tehsil | Beawar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-24012 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.1 acres, this one is larger than 76% of them.
No other mining lease on record is within 500 m of this site; 21 have applied within 5 km.
Where it is
Sar, Beawar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Existing Quartz & Feldspar Mining Project, ML No.- 06/1990", with Expansion… — cleared for impact study, 1.6 km away
- EC Transfer of Existing Quartz & Feldspar Mining Project (Production Capacity… — environmental approval granted, 1.6 km away
- "Reappraisal of the EC granted by DEIAA Ajmer for Quartz and Feldspar Mining… — environmental approval granted, 1.9 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — environmental approval granted, 2 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — withdrawn, 2 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — environmental approval granted, 2.3 km away
- Re-appraisal of EC issued by DEIAA for Sarmaliya Quartz & Feldspar Mine (M.L.… — withdrawn, 2.3 km away
- This is a Fresh proposal for "Quartz & Feldspar (Major Mineral) mining… — under environmental review, 4.3 km away
More from Mukul Sharma in Ajmer
- Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity… — environmental approval granted
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed
- Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.