Quick answers
What is this project?
Proposed River Sand (Bajri) Mining Project, Plot No. 55(15), (Area-77.1758 Ha.) At Khasra No. 222, 602 & 603 (Gair Mumkin Nadi) Village- Bashirpura & Lak, Tehsil- Peeplu, District-Tonk (Rajasthan) of M/s Kuldeep Trading Company is a proposed mining project in Bashirpura, Peeplu, Tonk, Rajasthan. The site covers 190.7 acres.
Who is building it?
The applicant is Kuldeep Trading Company.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Sept 2025), as of 27 Nov 2026.
Where is it?
In Bashirpura, Peeplu, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹40 crore and a site of 190.7 acres.
When was it filed?
The application was filed on 23 Sept 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Sept 2025 |
| Application filed | 23 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kuldeep Trading Company |
| Land area | 190.7 acres (77.2 ha) |
| Project cost | ₹40 crore |
| Village / locality | Bashirpura |
| Taluk / tehsil | Peeplu |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21792 |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 190.7 acres, this one is larger than 92% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 843.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Bashirpura, Peeplu, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Corrigendum on Environment Clearance Granted on 10.07.2023 for Lease — lapsed, 250 m away
- Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.-… — cleared for impact study, 850 m away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — lapsed, 900 m away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — cleared for impact study, 900 m away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — cleared for impact study, 900 m away
- Bajri(River Sand), Mining Project Plot No.- 56(Bajri Plot No. 16), Lease… — cleared for impact study, 2.3 km away
- Amendment in ToR for Change in Proposed Production Capacity from 3062329.2 TPA… — cleared for impact study, 2.3 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- 39 Bajri Plot No… — cleared for impact study, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.