Quick answers
What is this project?
Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha. and Plot No.-BJ- 09/2024), with production capacity of 3,66,750 TPA (ROM), located Near Village– Borda, Tehsil & District– Tonk (Rajasthan) by M/S Shree Kamakshi Transport, Proprietor-Shri Mayank Garg S/o Shri Madan Lal Agarwal is a proposed mining project in Lank, Peeplu, Tonk, Rajasthan. The site covers 100.7 acres.
Who is building it?
The applicant is Mayank Garg.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Jul 2025), as of 27 Nov 2026.
Where is it?
In Lank, Peeplu, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹22.2 crore and a site of 100.7 acres.
When was it filed?
The application was filed on 12 Mar 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Jul 2025 |
| Application filed | 12 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Mayank Garg |
| Land area | 100.7 acres (40.8 ha) |
| Project cost | ₹22.2 crore |
| Village / locality | Lank |
| Taluk / tehsil | Peeplu |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-22131 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Nov 2025 | Lapsed | 100.7 acres | ₹22.2 crore |
| Amendment filed 12 Mar 2025 (this page) | Cleared for impact study | 100.7 acres | ₹22.2 crore |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 100.7 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Lank, Peeplu, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — lapsed, 0 m away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — cleared for impact study, 0 m away
- Corrigendum on Environment Clearance Granted on 10.07.2023 for Lease — lapsed, 700 m away
- Proposed River Sand (Bajri) Mining Project, Plot No. 55(15), (Area-77.1758… — cleared for impact study, 900 m away
- Amendment in ToR for Change in Proposed Production Capacity from 3062329.2 TPA… — cleared for impact study, 1.4 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- 39 Bajri Plot No… — cleared for impact study, 1.4 km away
- Bajri(River Sand), Mining Project Plot No.- 56(Bajri Plot No. 16), Lease… — cleared for impact study, 1.4 km away
- Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.-… — cleared for impact study, 1.6 km away
More from Mayank Garg in Tonk
- Amendment in ToR for Change in Proposed Production Capacity from 3348828 TPA… — cleared for impact study
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.- BJ-48 Bajri Plot… — cleared for impact study
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- BJ-51/2024, Bajri… — environmental approval granted
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — environmental approval granted
- Bajri(River Sand), Mining Project Plot No.- 56(Bajri Plot No. 16), Lease… — cleared for impact study
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- BJ-51/2024, Bajri… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.