What is Developing? Open the mapMap

Cleared for impact studyMining · Tonk, Rajasthan

Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.- 37 (Bajri Plot No.- 08), Area 62.64 ha. (Govt. Land), located Near Village – Palra, Tehsil – Tonk & District– Tonk (Rajasthan) by M/s Balaji Natural Holdings Pvt. Ltd.

Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.- 37 (Bajri Plot No.- 08), Area 62.64 ha. (Govt. Land), located Near Village – Palra, Tehsil – Tonk & District– Tonk (Rajasthan) by M/s Balaji Natural Holdings Pvt. Ltd is a proposed mining project in Bashirpura, Peeplu, Tonk, Rajasthan. The site covers 154.8 acres. Its stated project cost is ₹30 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Sept 2025).

See it on the live map All projects in Tonk

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.- 37 (Bajri Plot No.- 08), Area 62.64 ha. (Govt. Land), located Near Village – Palra, Tehsil – Tonk & District– Tonk (Rajasthan) by M/s Balaji Natural Holdings Pvt. Ltd is a proposed mining project in Bashirpura, Peeplu, Tonk, Rajasthan. The site covers 154.8 acres.

Who is building it?

The applicant is Rise India Stone Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Sept 2025), as of 27 Nov 2026.

Where is it?

In Bashirpura, Peeplu, Tonk, Rajasthan.

How big is it?

It has a stated cost of ₹30 crore and a site of 154.8 acres.

When was it filed?

The application was filed on 16 Sept 2025.

Project details

StatusCleared for impact study
Status since18 Sept 2025
Application filed16 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRise India Stone Private Limited
Land area154.8 acres (62.6 ha)
Project cost₹30 crore
Village / localityBashirpura
Taluk / tehsilPeeplu
DistrictTonk
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-22163

In context

362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 154.8 acres, this one is larger than 89% of them.

No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.

Where it is

Bashirpura, Peeplu, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rise India Stone Private Limited in Tonk

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.