Quick answers
What is this project?
Proposed Project of Bajri (River Sand) Mining Project (Lease Area 90.2373ha. Govt. Land, Plot No.- BJ-50 (Bajri Plot No.- 26), with production capacity of 31,33,504.8 TPA (ROM) located Near Village –Jalseena, Tehsil –Duni, Distt –Tonk (Rajasthan) by M/s Goquest Solution Pvt. Lid is a proposed mining project in Jalseena, Duni, Tonk, Rajasthan. The site covers 223 acres.
Who is building it?
The applicant is Ajit Prasad Chatterjee.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Nov 2025), as of 27 Nov 2026.
Where is it?
In Jalseena, Duni, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹9 crore and a site of 223 acres.
When was it filed?
The application was filed on 29 Oct 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Nov 2025 |
| Application filed | 29 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ajit Prasad Chatterjee |
| Land area | 223 acres (90.2 ha) |
| Project cost | ₹9 crore |
| Village / locality | Jalseena |
| Taluk / tehsil | Duni |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-22596 |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 223 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.
Where it is
Jalseena, Duni, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — environmental approval granted, 2.2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — cleared for impact study, 2.2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-49/2024 Bajri… — withdrawn, 2.2 km away
- Amendment in ToR for Change in Proposed Production Capacity from 3348828 TPA… — cleared for impact study, 2.8 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.- BJ-48 Bajri Plot… — cleared for impact study, 2.8 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- BJ-51/2024, Bajri… — environmental approval granted, 3.2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No- BJ-51/2024, Bajri… — cleared for impact study, 3.2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot no. BJ-47 Bajri Plot… — environmental approval granted, 3.6 km away
More from Ajit Prasad Chatterjee in Tonk
- Proposed Project of Bajri (River Sand) Mining Project (Lease Area 12.6858ha.… — cleared for impact study
- Bajri(River Sand), Mining Project Plot No.- 58(Bajri Plot No. 18), Lease… — cleared for impact study
- Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.-… — cleared for impact study
- Proposed Project of Bajri River Sand (Minor Mineral), Plot No. BJ-53 (Bajri… — cleared for impact study
- Bajri(River Sand), Mining Project Plot No.- 59(Bajri Plot No. 19), Lease… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.