Quick answers
What is this project?
Re-Appraisal of EC Granted from DEIAA Pali To SEIAA, Rajasthan, For Existing "Limestone (Minor Mineral) mining project" [M.L.No.-746/1995] over an Area of 4.663 Hectare with Existing Production Capacity– 227243 MTPA by Smt. Sohani Devi W/o Shri Binja Ram Mali is an approved mining project in Nimbol, Jaitaran, Pali, Rajasthan. The site covers 11.5 acres.
Who is building it?
The applicant is Sohani.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2025), as of 27 Nov 2026.
Where is it?
In Nimbol, Jaitaran, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹58 lakh and a site of 11.5 acres.
When was it filed?
The application was filed on 6 May 2025.
Project details
| Official title | Re-Appraisal of EC Granted from DEIAA Pali To SEIAA, Rajasthan, For Existing "Limestone (Minor Mineral) mining project" [M.L.No.-746/1995] over an Area of 4.663 Hectare with Existing Production Capacity– 227243 MTPA, located at Near Village– Sinla, Tehsil–Jaitaran and New District– Beawar (Old District– Pali)(Rajasthan) by Smt. Sohani Devi W/o Shri Binja Ram Mali. |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 May 2025 |
| Application filed | 6 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sohani |
| Land area | 11.5 acres (4.7 ha) |
| Project cost | ₹58 lakh |
| Village / locality | Nimbol |
| Taluk / tehsil | Jaitaran |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-23522 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.5 acres, this one is larger than 80% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 31 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 39 mining leases have applied within 5 km.
Where it is
Nimbol, Jaitaran, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Earlier Granted EC from Shri Prakash Chandra Mathur S/o Shri Ram… — environmental approval granted, 0 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Pali(Rajasthan) of… — environmental approval granted, 250 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Pali(Raj.) of our… — environmental approval granted, 400 m away
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — more information requested, 550 m away
- "Limestone Mining Project, Block- NB02" with Proposed Limestone Production… — cleared for impact study, 550 m away
- "Limestone Mining Project, Block- NB02" with Proposed Production Capacity- 0.6… — lapsed, 550 m away
- EC Re-appraisal of Existing Lime Stone Mining Lease (M.L. No. – 189/08 & Area:… — environmental approval granted, 700 m away
- "Limestone Mining Project, Block- NB01" with Proposed Limestone Production… — more information requested, 800 m away
More from Sohani in Pali
- Transfer of Earlier Granted EC from Shri Prakash Chandra Mathur S/o Shri Ram… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.