Proposed Project for River Bed Sand Mining (Bajri) Plot No.215 (Bajri Plot) for Mineral River Bed Sand (Bajri) near village:Payla Kalan &Payla Khurd, Tehsil- Sindhari, and District: Balotra, for anarea 86.167 hectare. Proposed Production –465301.8 TPA (ROM) is an approved mining project in Bhalkhadi, Sindhari, Barmer, Rajasthan. The site covers 212.9 acres.
Who is building it?
The applicant is Prakash.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jun 2025), as of 27 Nov 2026.
Where is it?
In Bhalkhadi, Sindhari, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹10.5 crore and a site of 212.9 acres.
When was it filed?
The application was filed on 12 May 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Jun 2025 |
| Application filed | 12 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prakash |
| Land area | 212.9 acres (86.2 ha) |
| Project cost | ₹10.5 crore |
| Village / locality | Bhalkhadi |
| Taluk / tehsil | Sindhari |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27498 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 May 2025 (this page) | Environmental approval granted | 212.9 acres | ₹10.5 crore |
| Early planning filed 22 Nov 2024 | Cleared for impact study | 212.9 acres | ₹10.5 crore |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 212.9 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bhalkhadi, Sindhari, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project for River Bed Sand Mining (Bajri) Plot No.215 (Bajri Plot)… — cleared for impact study, 0 m away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No. 216(Bajri Plot)… — environmental approval granted, 4.2 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No. 216(Bajri Plot)… — cleared for impact study, 4.2 km away
- Proposed River Sand Mine Bajri (Minor Mineral) Mine Plot No. 217 from Luni… — environmental approval granted, 8.8 km away
- Proposed River Sand Mine Bajri (Minor Mineral) Mine Plot No. 217 from Luni… — under environmental review, 8.8 km away
- Barmer-I PS-Sirohi PS 765kV D/C Transmission Line Overhead Transmission line… — forest land use approved, 9.3 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No. 218 (for Mineral… — environmental approval granted, 10.4 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No. 218 (for Mineral… — cleared for impact study, 10.4 km away
More from Prakash in Barmer
- "Bachdau" Granite Cluster Mining Project of Near Village-Bachdau, Tehsil-… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.