Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Apr 2026 |
| Application filed | 13 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 99.2 acres (40.1 ha) |
| Forest land | 11.8 acres (4.8 ha) |
| Project cost | ₹18.2 crore |
| Village / locality | Nagaur |
| Taluk / tehsil | Nagaur |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36251 |
In context
15 applications in Nagaur since January 2022 are in the same category (Roads & highways): 8 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3.4 years from filing to approval. At 99.2 acres, this one is larger than 60% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Foot over Bridges (FOB) on left out portion of NH-65 near Baldev Ram Mirdha… — initial checks, 50 m away
- Access Permission for Laying of Underground 350 Mm Dia Di Water Pipeline From… — forest land use approved, 900 m away
- Proposed Commercial Project "r3c Luxury Mall" (Gross Bua-37,948.31 Sq.M &… — lapsed, 1.4 km away
- Smt. Madhu Mirdha, Masonary Stone Mine, Ml No-47/2008 — lapsed, 2.6 km away
- Proposed Industrial Shed for Spice processing unit having capacity 100 TPD… — environmental approval granted, 3 km away
- Consultancy Service for Preparation of Detail Engineering Report for the… — lapsed, 5.1 km away
- Shri Ajay Jain, Lime Stone Mine, Ml No-119/07 — environmental approval granted, 5.5 km away
- Sh. Darab Khan, Mineral-Masonry Stone, ML No.-113/2007 — environmental approval granted, 9.7 km away
More from Ministry of Road Transport & Highways in Nagaur
- Windening of Nagaur-Bikaner Section on NH-62 in Distt - Nagaur in the State of… — under forest review
- Foot over Bridges (FOB) on left out portion of NH-65 near Baldev Ram Mirdha… — initial checks
- Nagaur Bypass (Balance Length) From Existing Km161+000 (Amarpura on NH-58) to… — more information requested
- Widening From Two Lane to Four Lane With Paved Shoulder From Km 180+500 to Km… — lapsed
- Consultancy Service for Preparation of Detail Engineering Report for the… — lapsed
- Detailed Project Report for Consultancy Services for Preparation of Detail… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.