Quick answers
What is this project?
400 kV D/C Neemuch Pooling Station -Mandsaur Transmission Line is a lapsed power project in Parlai Khurd, Rawatbhata, Chittaurgarh, Rajasthan. The site covers 280.5 acres.
Who is building it?
The applicant is Neemuch Transmission Limited.
Has it been approved?
No. The application was lapsed on 7 Aug 2023, so it is no longer under consideration.
Where is it?
In Parlai Khurd, Rawatbhata, Chittaurgarh, Rajasthan.
How big is it?
It has a stated cost of ₹305 crore; a site of 280.5 acres and 48.1 acres (19.5 ha) of forest land.
When was it filed?
The application was filed on 23 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Aug 2023 |
| Application filed | 23 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Neemuch Transmission Limited |
| Land area | 280.5 acres (113.5 ha) |
| Forest land | 48.1 acres (19.5 ha) |
| Project cost | ₹305 crore |
| Village / locality | Parlai Khurd |
| Taluk / tehsil | Rawatbhata |
| District | Chittaurgarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36548 |
In context
12 applications in Chittaurgarh since January 2022 are in the same category (Power): 6 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.
Where it is
Parlai Khurd, Rawatbhata, Chittaurgarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 400kV D/C Neemuch Mandsaur Transmission Line — forest land use approved, 5.5 km away
- 400 kV D/c Neemuch - Mandsaur Transmission line — lapsed, 6.2 km away
- Tal-Kojya Road (Parlai) to Dungarpur, Timriya — lapsed, 7.4 km away
- Strengthening & Widening Work of Road Tolu Ka Luhariya to M.P. Border Via… — lapsed, 8 km away
- "Construction of 400 kV D/C Neemuch(PS)_Pachora(PS) Transmission line — lapsed, 10 km away
- Construction of 400 kV D/C Neemuch(PS) - Pachora(PS) Transmission line — more information requested, 14.2 km away
- Laying of Pipe Line Water Supply Project of 648 villages in Block Begun… — decision issued, 17.4 km away
- Laying of Pipe Line Water Supply Project of 648 villages in Block Begun… — more information requested, 17.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.