Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 2 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bro/758 Brtf |
| Land area | 52.6 acres (21.3 ha) |
| Forest land | 44.7 acres (18.1 ha) |
| Project cost | ₹251 crore |
| Village / locality | Chungthang |
| Taluk / tehsil | Chungthang |
| District | North District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00036 |
In context
15 applications in North District since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 52.6 acres, this one is smaller than 54% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chungthang, North District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Granting Permission for laying OFC Cable through Overhead Methodology from… — lapsed, 550 m away
- Granting Permission for laying OFC Cable through Overhead Methodology from… — lapsed, 550 m away
- Bypass in (NH 310a) to Nhdl Specification With Paved Shoulder From Chungthang… — lapsed, 3.1 km away
- Bypass in (NH 310a) to Nhdl Specification With Paved Shoulder From Chungthang… — more information requested, 3.3 km away
- Diversion of 0.1340 ha of forest land for const of Sewerage Treatment Plant at… — forest land use approved, 3.8 km away
- Diversion of 0.5252 ha of forest land for part construction of Rabom Chu HEP… — forest land use approved, 4.4 km away
- Teesta Hydroelectric Project Stage-III (1200 MW) — environmental approval granted, 6.7 km away
- Teesta Hydroelectric Project Stage-III (1200 MW) — withdrawn, 6.7 km away
More from Bro/758 Brtf in North District
- Bypass in (NH 310a) to Nhdl Specification With Paved Shoulder From Chungthang… — more information requested
- Construction/ Improvement of NH 310ag to Nhdl Specification With Paved… — forest land use approved
- Bypass in (NH 310a) to Nhdl Specification With Paved Shoulder From Chungthang… — lapsed