Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2024 |
| Application filed | 14 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Sikkim Urja Limited |
| Land area | 6,639.5 acres (2,686.9 ha) |
| Project cost | ₹18,154.5 crore |
| Village / locality | Singchit |
| Taluk / tehsil | Mangan |
| District | North District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00007 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 14 Oct 2024 (this page) | Environmental approval granted | 6,639.5 acres | ₹18,154.5 crore |
| Ownership transfer filed 14 Oct 2024 | Withdrawn | 6,639.5 acres | ₹18,154.5 crore |
In context
12 applications in North District since January 2022 are in the same category (Water & irrigation): 9 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6,639.5 acres, this one is larger than 83% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Singchit, Mangan, North District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Teesta Hydroelectric Project Stage-III (1200 MW) — withdrawn, 0 m away
- Diversion of Forest Land Required for Realignment Between Km 80.800 to Km… — lapsed, 3.1 km away
- Diversion of 2.895 ha of forest land for const of 10 MW New Meyong Chu HEP at… — forest land use approved, 3.2 km away
- Teesta Hydroelectric Project Stage-III (1200 MW) — environmental approval granted, 3.6 km away
- Diversion of forest land of 0.016 ha for construction of Plastic Waste… — more information requested, 3.6 km away
- Diversion of 3.058 Ha of forest land for rehabilitation site for flashflood or… — not approved, 3.9 km away
- Re-alignment of 2.79 ha of forest land for const of 10 MW New Meyong Chu HEP… — forest land use approved, 3.9 km away
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — forest land use approved, 3.9 km away
More from Sikkim Urja Limited in North District
- Teesta Hydroelectric Project Stage-III (1200 MW) — environmental approval granted
All 3 Sikkim Urja projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.