Quick answers
What is this project?
Diversion of 1.9763 Ha of forest land for "Drawing of New 66KV D/C Transmission line from LLHP to Tadong 66/11KV Substation" under Gangtok Division by Power Department, Government of Sikkim is a proposed power project in Nandok, Gangtok, East District, Sikkim. The site covers 6.1 acres.
Who is building it?
The applicant is Power Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Nandok, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹25 crore; a site of 6.1 acres and 4.9 acres (2 ha) of forest land.
When was it filed?
The application was filed on 15 Sept 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Nov 2025 |
| Application filed | 15 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Power Department |
| Land area | 6.1 acres (2.5 ha) |
| Forest land | 4.9 acres (2 ha) |
| Project cost | ₹25 crore |
| Village / locality | Nandok |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00180 |
In context
12 applications in East District since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. At 6.1 acres, this one is smaller than 67% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandok, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 0.034 Ha for Construction of 15.24 Meter Length… — lapsed, 450 m away
- Diversion of Forest Land for Laying of Ofc Cable of Gaok-Enb-0025 Connecting… — lapsed, 1.2 km away
- Khangchendzonga Tourist Centre, (KTC) — environmental approval granted, 1.8 km away
- New Road From Phewa Busty to Indira Bye Pass in Gangtok, Sikkim — more information requested, 2.5 km away
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — under forest review, 2.7 km away
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — lapsed, 2.7 km away
- Laying of Optical Fibre Cable from SAJONG (RUMTEK) (27.33171 88.55802) TO… — lapsed, 2.9 km away
- Laying of Optical Fibre Cable from SAJONG (RUMTEK) (27.33171 88.55802) TO… — more information requested, 2.9 km away
More from Power Department in East District
- Diversion of Forest Land 0.0742 Ha (Wild Life) for Laying of Under Ground… — in-principle approval, conditions pending
- Diversion of forest land (WL) for Laying under ground electrical cable from… — decision issued
- Diversion of Forest Land for the work "Construction of 132kv D/C Transmission… — in-principle approval, conditions pending
- Laying under ground electrical cable from Hatticheray to Mulkharka SSB Camp… — decision issued
- Diversion of forest land of 0.0814 Ha for construction of 11KV HT line at… — more information requested
6 Power Department projects in East District
All 16 Power Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.