Quick answers
What is this project?
Rongnichu Hydroelectric Project by M/S Madhya Bharat Power Corporation Limited is a lapsed water and irrigation project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 1.1 acres.
Who is building it?
The applicant is Madhya Bharat Power Corporation Limited.
Has it been approved?
No. The application was lapsed on 9 Apr 2024, so it is no longer under consideration.
Where is it?
In Pakyong Forest Block, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹1,620.7 crore; a site of 1.1 acres and 1.1 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 22 Sept 2023.
Project details
| Official title | Rongnichu Hydroelectric Project by M/S Madhya Bharat Power Corporation Limited in the East District of Sikkim |
|---|---|
| Status | Lapsed |
| Status since | 9 Apr 2024 |
| Application filed | 22 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Madhya Bharat Power Corporation Limited |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹1,620.7 crore |
| Village / locality | Pakyong Forest Block |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00089 |
In context
14 applications in East District since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. At 1.1 acres, this one is larger than 73% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Additional 0.4542 Ha. Forest Land in Site RF, Pakyong Forest… — lapsed, 0 m away
- Re-Diversion of 0.4542 Ha Forest Land Due to Technical Realignment of… — forest land use approved, 100 m away
- Diversion of Forest Land of 0.0271 Ha for Construction of Development of… — lapsed, 1.7 km away
- Sikkim Integrated Urban Development Project — lapsed, 2.3 km away
- Approach road to the cremation ground at Majhitar under Central & West Pandam,… — more information requested, 3.2 km away
- Diversion of Forest Land for the work "Construction of 132kv D/C Transmission… — in-principle approval, conditions pending, 4.1 km away
- Widening of Existing Carriageway Into 2 Lanes With Paved Shoulder… — more information requested, 5 km away
- Diversion of 63.73 Ha of Forest Land for Regularization (8.0 Ha — more information requested, 6.5 km away
More from Madhya Bharat Power Corporation Limited in East District
- Re-Diversion of 0.4542 Ha Forest Land Due to Technical Realignment of… — forest land use approved
- Diversion of Additional 0.4542 Ha. Forest Land in Site RF, Pakyong Forest… — lapsed
All 3 Madhya Bharat Power Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.