In-principle approval, conditions pendingPower · East District, Sikkim

Diversion of Forest Land for the work "Construction of 132kv D/C Transmission Line from Samardong (Chalamthang) to Railway Station Yard at Khanikhola, Majitar

Diversion of Forest Land for the work "Construction of 132kv D/C Transmission Line from Samardong (Chalamthang) to Railway Station Yard at Khanikhola, Majitar is a proposed power project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 25.2 acres. Its stated project cost is ₹18.4 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 5 Sept 2026).

See it on the live map All projects in East District

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land for the work "Construction of 132kv D/C Transmission Line from Samardong (Chalamthang) to Railway Station Yard at Khanikhola, Majitar is a proposed power project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 25.2 acres.

Who is building it?

The applicant is Power Department.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Pakyong Forest Block, Pakyong, East District, Sikkim.

How big is it?

It has a stated cost of ₹18.4 crore; a site of 25.2 acres and 23.8 acres (9.6 ha) of forest land.

When was it filed?

The application was filed on 2 May 2025.

Project details

Official titleDiversion of Forest Land for the work "Construction of 132kv D/C Transmission Line from Samardong (Chalamthang) to Railway Station Yard at Khanikhola, Majitar along with 132 kv GIS Bay Extension, (Package I: Construction of 132kv D/C Transmission Line)'' is Proposed on priority having a surveyed Length of 3.772 Km under Pakyong District by Power Department, Govt. of Sikkim
StatusIn-principle approval, conditions pending
Status since5 Sept 2026
Application filed2 May 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantPower Department
Land area25.2 acres (10.2 ha)
Forest land23.8 acres (9.6 ha)
Project cost₹18.4 crore
Village / localityPakyong Forest Block
Taluk / tehsilPakyong
DistrictEast District
StateSikkim
Location fromSite boundary on record
Our referenceWID-SK-00165

In context

12 applications in East District since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. At 25.2 acres, this one is larger than 67% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Power Department in East District

6 Power Department projects in East District
All 16 Power Department projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.