Widening of Existing Carriageway Into 2 Lanes With Paved Shoulder Configuration and Several Slope Protection Works, Treatment of Vulnerable Sliding/ Sinking Zones, Improvement of Safety and Sustainable of NH Network by Incorporating Bypasses, Viaducts Brides Tunnels Etc. Along NH-10 From Km 52.00 (Rangpo) to Km. 80.00 (Ranipool) in the State of Sikkim

Widening of Existing Carriageway Into 2 Lanes With Paved Shoulder Configuration and Several Slope Protection Works, Treatment of Vulnerable Sliding/ Sinking Zones, Improvement of Safety and Sustainable of NH Network by Incorporating Bypasses, Viaducts Brides Tunnels Etc. Along NH-10 From Km 52.00 (Rangpo) to Km. 80.00 (Ranipool) in the State of Sikkim is a proposed road project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 26.1 acres. Its stated project cost is ₹1,382 crore. As of 27 Nov 2026, its status is “More information requested” (since 21 Nov 2026).

See it on the live map All projects in East District

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Widening of Existing Carriageway Into 2 Lanes With Paved Shoulder Configuration and Several Slope Protection Works, Treatment of Vulnerable Sliding/ Sinking Zones, Improvement of Safety and Sustainable of NH Network by Incorporating Bypasses, Viaducts Brides Tunnels Etc. Along NH-10 From Km 52.00 (Rangpo) to Km. 80.00 (Ranipool) in the State of Sikkim is a proposed road project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 26.1 acres.

Who is building it?

The applicant is National Highways & Infrastructure Development Corporation Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Pakyong Forest Block, Pakyong, East District, Sikkim.

How big is it?

It has a stated cost of ₹1,382 crore; a site of 26.1 acres and 26.1 acres (10.6 ha) of forest land.

When was it filed?

The application was filed on 7 Aug 2025.

Project details

StatusMore information requested
Status since21 Nov 2026
Application filed7 Aug 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highways & Infrastructure Development Corporation Limited
Land area26.1 acres (10.6 ha)
Forest land26.1 acres (10.6 ha)
Project cost₹1,382 crore
Village / localityPakyong Forest Block
Taluk / tehsilPakyong
DistrictEast District
StateSikkim
Location fromSite boundary on record
Our referenceWID-SK-00104

In context

22 applications in East District since January 2022 are in the same category (Roads & highways): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 26.1 acres, this one is larger than 84% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 43 National Highways and Infrastructure Development Corporation (NHIDCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.