Quick answers
What is this project?
Diversion of 0.81 Ha of Forest Land for Regularization of Nayabazar Junior High School by Education Department, Govt. of Sikkim is a proposed public facility in Nayabazar Forest Block, Soreng, West District, Sikkim. The site covers 2 acres.
Who is building it?
The applicant is Education Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Nayabazar Forest Block, Soreng, West District, Sikkim.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 2 acres and 2 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 1 Sept 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 27 Aug 2025 |
| Application filed | 1 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Public facilities |
| Applicant | Education Department |
| Land area | 2 acres (0.8 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Nayabazar Forest Block |
| Taluk / tehsil | Soreng |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00107 |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nayabazar Forest Block, Soreng, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1849 Ha Forest Land for the Construction of Filter House Above… — under forest review, 50 m away
- Diversion of forest land for Strengthening, Carpeting and Drainage work at… — under forest review, 500 m away
- Construction of Bihari Bhawan at Jorethang South Sikkim — lapsed, 500 m away
- Construction and Maintenance of Bridge Over Ramman Khola Along Singla Bazar… — under forest review, 550 m away
- Proposal of Laying Optical Fiber Cable of Jort-Enb-9001 Connecting Through… — lapsed, 800 m away
- Laying Ofc of Zoom Connecting Through Forest Areas of Zoom Reserve Forest… — lapsed, 950 m away
- Diversion of 0.544 Ha of Forest Land for Laying of Ofc Cable of Zoom 2… — lapsed, 2.5 km away
- Diversion of Forest Land for Laying of Ofc Cable of Zoom 2 Connecting Through… — lapsed, 2.5 km away
More from Education Department in West District
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.