Quick answers
What is Construction of Bihari Bhawan at Jorethang South Sikkim?
Construction of Bihari Bhawan at Jorethang South Sikkim is a lapsed project in Suntaley, Soreng, West District, Sikkim. The site covers 0.2 acres.
Who is building it?
The applicant is Sujan Pradhan.
Has it been approved?
No. The application was lapsed on 17 Jan 2023, so it is no longer under consideration.
Where is it?
In Suntaley, Soreng, West District, Sikkim.
How big is it?
It has a stated cost of ₹8.7 crore; a site of 0.2 acres and 910 m² of forest land.
When was it filed?
The application was filed on 3 Jul 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Jan 2023 |
| Application filed | 3 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Sujan Pradhan |
| Land area | 900 m² |
| Forest land | 910 m² |
| Project cost | ₹8.7 crore |
| Village / locality | Suntaley |
| Taluk / tehsil | Soreng |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00127 |
In context
21 applications in West District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Suntaley, Soreng, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of Laying Optical Fiber Cable of Jort-Enb-9001 Connecting Through… — lapsed, 350 m away
- Diversion of 0.81 Ha of Forest Land for Regularization of Nayabazar Junior… — more information requested, 500 m away
- Diversion of 0.1849 Ha Forest Land for the Construction of Filter House Above… — under forest review, 550 m away
- Construction and Maintenance of Bridge Over Ramman Khola Along Singla Bazar… — under forest review, 800 m away
- Diversion of forest land for Strengthening, Carpeting and Drainage work at… — under forest review, 850 m away
- Laying Ofc of Zoom Connecting Through Forest Areas of Zoom Reserve Forest… — lapsed, 1.3 km away
- Diversion of 0.544 Ha of Forest Land for Laying of Ofc Cable of Zoom 2… — lapsed, 2.5 km away
- Diversion of Forest Land for Laying of Ofc Cable of Zoom 2 Connecting Through… — lapsed, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.