Quick answers
What is this project?
Diversion of 0.1849 Ha Forest Land for the Construction of Filter House Above Naya Bazar School Tank, by Phe Department, Gos Under Soreng T Division is a proposed water and irrigation project in Nayabazar Forest Block, Soreng, West District, Sikkim. The site covers 0.4 acres.
Who is building it?
The applicant is Public Health Engineering Department.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Nayabazar Forest Block, Soreng, West District, Sikkim.
How big is it?
It has a stated cost of ₹19 lakh; a site of 0.4 acres and 1,850 m² of forest land.
When was it filed?
The application was filed on 2 Oct 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 1 Nov 2026 |
| Application filed | 2 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Public Health Engineering Department |
| Land area | 1,800 m² |
| Forest land | 1,850 m² |
| Project cost | ₹19 lakh |
| Village / locality | Nayabazar Forest Block |
| Taluk / tehsil | Soreng |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00205 |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nayabazar Forest Block, Soreng, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.81 Ha of Forest Land for Regularization of Nayabazar Junior… — more information requested, 50 m away
- Diversion of forest land for Strengthening, Carpeting and Drainage work at… — under forest review, 400 m away
- Construction of Bihari Bhawan at Jorethang South Sikkim — lapsed, 550 m away
- Construction and Maintenance of Bridge Over Ramman Khola Along Singla Bazar… — under forest review, 600 m away
- Proposal of Laying Optical Fiber Cable of Jort-Enb-9001 Connecting Through… — lapsed, 850 m away
- Laying Ofc of Zoom Connecting Through Forest Areas of Zoom Reserve Forest… — lapsed, 900 m away
- Diversion of 0.544 Ha of Forest Land for Laying of Ofc Cable of Zoom 2… — lapsed, 2.5 km away
- Diversion of Forest Land for Laying of Ofc Cable of Zoom 2 Connecting Through… — lapsed, 2.5 km away
More from Public Health Engineering Department in West District
- Diversion of 1.44 Ha of Forest Land for Const of Approach Road to Sewerage… — more information requested
All 10 Public Health Engineering Department, Sikkim projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.