Quick answers
What is this project?
L.D Kazi Centre for Wellness and Sports Facilities at Chakung, Soreng District, Sikkim is a proposed project in Aroobotey, Soreng, West District, Sikkim. The site covers 2.3 acres.
Who is building it?
The applicant is L D Kazi Centre for Wellness and Sports Facilities at Chakung,soreng District,sikkim.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Aroobotey, Soreng, West District, Sikkim.
How big is it?
It has a stated cost of ₹36.1 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 25 Nov 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Sept 2026 |
| Application filed | 25 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | L D Kazi Centre for Wellness and Sports Facilities at Chakung,soreng District,sikkim |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹36.1 crore |
| Village / locality | Aroobotey |
| Taluk / tehsil | Soreng |
| District | West District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00201 |
In context
21 applications in West District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 2.3 acres, this one is larger than 55% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aroobotey, Soreng, West District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.9851 ha of a 66/11KV, 3x5 MVA sub station for supply to Netaji… — lapsed, 1.6 km away
- Laying Ofc of Zoom Connecting Through Forest Areas of Zoom Reserve Forest… — lapsed, 2.1 km away
- Diversion of forest land for Strengthening, Carpeting and Drainage work at… — under forest review, 2.4 km away
- Diversion of 0.1849 Ha Forest Land for the Construction of Filter House Above… — under forest review, 2.8 km away
- Diversion of 0.81 Ha of Forest Land for Regularization of Nayabazar Junior… — more information requested, 2.8 km away
- Construction and Maintenance of Bridge Over Ramman Khola Along Singla Bazar… — under forest review, 2.9 km away
- Diversion of 0.544 Ha of Forest Land for Laying of Ofc Cable of Zoom 2… — lapsed, 3.2 km away
- Diversion of Forest Land for Laying of Ofc Cable of Zoom 2 Connecting Through… — lapsed, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.