Quick answers
What is this project?
Diversion process of Forest Land measuring 0.09 Ha for the construction of Office cum Residential Complex at Chujachen gorucharan under Rongli (T) Range is an approved telecom project in Chujachen, Rongli, East District, Sikkim. The site covers 0.2 acres.
Who is building it?
The applicant is Subsidiary Intelligence Bureau Gangtok.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 May 2026), as of 27 Nov 2026.
Where is it?
In Chujachen, Rongli, East District, Sikkim.
How big is it?
It has a stated cost of ₹4 crore; a site of 0.2 acres and 900 m² of forest land.
When was it filed?
The application was filed on 28 May 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 28 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Subsidiary Intelligence Bureau Gangtok |
| Land area | 900 m² |
| Forest land | 900 m² |
| Project cost | ₹4 crore |
| Village / locality | Chujachen |
| Taluk / tehsil | Rongli |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00211 |
In context
13 applications in East District since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.2 acres, this one is larger than 73% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chujachen, Rongli, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Repair and Extension of Water Supply to Rhenock Government College — more information requested, 2.6 km away
- Repair and Extension of Water Supply to Rhenock Government College — under wildlife review, 2.6 km away
- Repair and Extension of Water Supply to Rhenock Government College — decision issued, 2.6 km away
- Diversion of Forest Land 0.0742 Ha (Wild Life) for Laying of Under Ground… — in-principle approval, conditions pending, 3.1 km away
- Diversion of forest land (WL) for Laying under ground electrical cable from… — decision issued, 3.1 km away
- Laying under ground electrical cable from Hatticheray to Mulkharka SSB Camp… — decision issued, 3.1 km away
- Construction and Maintenance of Two Lane With Paved Shoulder of Rorathang to… — withdrawn, 3.8 km away
- Diversion of 0.7755 Ha of Forest Land for the Construction of Link Road From… — more information requested, 5.5 km away
More from Subsidiary Intelligence Bureau Gangtok in East District
- Diversion of Forest Land 0.20 Hac for Construction of Office Complex for… — more information requested
- Rumtek Diversion Process — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.