Quick answers
What is this project?
Diversion of 0.7755 Ha of Forest Land for the Construction of Link Road From Bakhutar to Bajani (1km) in Pakyong Distict by the Roads & Bridges Department, Government of Sikkim is a proposed road project in Rongli Forest Block, Rongli, East District, Sikkim. The site covers 2.1 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Rongli Forest Block, Rongli, East District, Sikkim.
How big is it?
It has a stated cost of ₹90 lakh; a site of 2.1 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 2 Apr 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 2 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 2.1 acres (0.8 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Rongli Forest Block |
| Taluk / tehsil | Rongli |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00147 |
In context
22 applications in East District since January 2022 are in the same category (Roads & highways): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 2.1 acres, this one is larger than 58% of them.
Where it is
Rongli Forest Block, Rongli, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ascon Ph IV MW Site Pt 3777 — decision issued, 5.4 km away
- Ascon Ph IV MW Site Pt 3777 — more information requested, 5.4 km away
- Construction / Improvement of Road Rishi – Rongli – Kupup From Km 53.00 to Km… — decision issued, 5.5 km away
- Diversion process of Forest Land measuring 0.09 Ha for the construction of… — forest land use approved, 5.5 km away
- Construction/Improvement Of Road Rishi-Rongli-Kupup From Km 53.00 To Km 70.00… — more information requested, 5.5 km away
- Repair and Extension of Water Supply to Rhenock Government College — more information requested, 6.5 km away
- Repair and Extension of Water Supply to Rhenock Government College — under wildlife review, 6.5 km away
- Repair and Extension of Water Supply to Rhenock Government College — decision issued, 6.5 km away
More from Public Works Department in East District
- Diversion of 0.02 Ha of Forest Land for the Construction of 62mtr Span Steel… — initial checks
- Diversion of 0.3192 ha of forest land for construction of Single lane Link… — lapsed
- Diversion of 0.1308 Ha of Forest Land for Construction of Road From Lower… — forest land use approved
- Diversion of 0.0183 Ha of Forest Land for Const of Sewerage System for Zone… — forest land use approved
- Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper… — in-principle approval, conditions pending
6 Public Works Department, Sikkim projects in East District
All 21 Public Works Department, Sikkim projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.