Quick answers
What is this project?
Diversion of Forest Land 0.20 Hac for Construction of Office Complex for Subsidiary Intelligence Bureau (Sib) Under Pakyong (T) Range Pakyong District is a proposed telecom project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 0.5 acres.
Who is building it?
The applicant is Subsidiary Intelligence Bureau Gangtok.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Pakyong Forest Block, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹4 crore; a site of 0.5 acres and 2,000 m² of forest land.
When was it filed?
The application was filed on 24 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 24 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Subsidiary Intelligence Bureau Gangtok |
| Land area | 2,000 m² |
| Forest land | 2,000 m² |
| Project cost | ₹4 crore |
| Village / locality | Pakyong Forest Block |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00091 |
In context
13 applications in East District since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.5 acres, this one is larger than 82% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sikkim Integrated Urban Development Project — more information requested, 900 m away
- Clear Water Reservoir in Pakyong under Sikkim Integrated Urban Development… — more information requested, 1 km away
- Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel — lapsed, 1.6 km away
- Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel — lapsed, 1.6 km away
- Diversion of 0.96 Ha of Forest Land for Construction of Play Ground With Basic… — lapsed, 2.5 km away
- Laying of Proposed 18 Ø (Carbon steel) Natural Gas Pipeline — lapsed, 3.6 km away
- Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper… — in-principle approval, conditions pending, 3.7 km away
- Diversion of forest land for construction of Christian Burial land at Namli… — not approved, 3.9 km away
More from Subsidiary Intelligence Bureau Gangtok in East District
- Rumtek Diversion Process — forest land use approved
- Diversion process of Forest Land measuring 0.09 Ha for the construction of… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.