Quick answers
What is this project?
Diversion of Forest Land of 0.2775Ha from Bheem Base to Bheem Top for construction of operational track inside Pangolakha Wild Life Sanctuary is a project in Kyongnosla Forest Block, Gangtok, East District, Sikkim. The site covers 0.7 acres.
Who is building it?
The applicant is Ministry of Defence.
Has it been approved?
Yes. Its status is “Decision issued” (since 15 May 2023), as of 27 Nov 2026.
Where is it?
In Kyongnosla Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹12,100 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 15 May 2023.
Project details
| Status | Decision issued |
|---|---|
| Status since | 15 May 2023 |
| Application filed | 15 May 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Ministry of Defence |
| Land area | 2,800 m² |
| Project cost | ₹12,100 crore |
| Village / locality | Kyongnosla Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00239 |
In context
34 applications in East District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.7 acres, this one is smaller than 77% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kyongnosla Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Operation of Departmental Hot Mix Plant 20/30 τρη ατ Km 1.50 on Tri Jn Bheem… — decision issued, 950 m away
- Diversion of Forest Land of 1.25 Ha from Track Junction to Dongchui La inside… — more information requested, 2.3 km away
- Diversion of 0.9 Ha Forest Land at Pangolakha Life Life Sanctuary for… — decision issued, 2.7 km away
- Diversion of Forest Land of 0.52 Ha from Ghora Gap to Pt 4531 inside… — decision issued, 2.7 km away
- Diversion of Forest Land of 0.2 Ha from Gurmail Hill to Saragri inside… — under wildlife review, 2.9 km away
- Helipad at Dokala and Idl at Bheem Base 0.96 Ha (2.371 Acres) — decision issued, 3 km away
- Diversion of Forest Land of 1.25 Ha from Doka La to Gurmail Hill inside… — decision issued, 3 km away
- Diversion of Forest Land of 1.686Ha from Doka La – LBR - UBR inside Pangolakha… — decision issued, 4.4 km away
More from Ministry of Defence in East District
- Construction of Cavern by 3/11 Gr at General Area of Rajgarh — initial checks
- Under Ground Signal Centre at Kupup — decision issued
- Ascon Ph IV MW Site Pt 3777 — decision issued
- Ascon Ph IV MW Site Pt 3777 — more information requested
- Diversion of 191.621 Acres Forest Land Between Milestone-4 to Milestone-13 — lapsed
- Diversion of 1.6 Ha Forest Land at Arjun Fwd -Jelep Cho to Sangae Pp (Sangae… — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.