Quick answers
What is this project?
Diversion of 1.6 Ha Forest Land at Arjun Fwd -Jelep Cho to Sangae Pp (Sangae Pp to Arjun Base) for Construction of Operational Tracks for Defence is a project in Gnathang Forest Block, Gangtok, East District, Sikkim. The site covers 4 acres.
Who is building it?
The applicant is Ministry of Defence.
Has it been approved?
Yes. Its status is “Decision issued” (since 8 Aug 2024), as of 27 Nov 2026.
Where is it?
In Gnathang Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹26 lakh and a site of 4 acres.
When was it filed?
The application was filed on 8 Aug 2024.
Project details
| Status | Decision issued |
|---|---|
| Status since | 8 Aug 2024 |
| Application filed | 8 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Ministry of Defence |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹26 lakh |
| Village / locality | Gnathang Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00256 |
In context
34 applications in East District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 4 acres, this one is larger than 71% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gnathang Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 0.961Ha from Saragarhi(Asha Post) to Jelep Cho… — decision issued, 750 m away
- Diversion of Forest Land of 1.00 Ha from Sesa Mor to Tiger Hill for… — application filed, 1.8 km away
- Construction /Improvement of Op Tr Chor II - Saragrahi From Its Existing… — decision issued, 1.8 km away
- Construction /Improvement of Op Tr Chor II - Sherathang From Its Existing… — under wildlife review, 1.8 km away
- Diversion of 0.9 Ha Forest Land at Pangolakha Life Life Sanctuary for… — decision issued, 1.9 km away
- Diversion of Forest Land of 1.25 Ha from Track Junction to Dongchui La inside… — more information requested, 2.3 km away
- Job No : 2789/25-26 (S & C) : Cavern — under wildlife review, 2.4 km away
- Modern Yak Milk Processing and Value Addition Unit for Production and… — under forest review, 3.1 km away
More from Ministry of Defence in East District
- Construction of Cavern by 3/11 Gr at General Area of Rajgarh — initial checks
- Under Ground Signal Centre at Kupup — decision issued
- Ascon Ph IV MW Site Pt 3777 — decision issued
- Ascon Ph IV MW Site Pt 3777 — more information requested
- Diversion of 191.621 Acres Forest Land Between Milestone-4 to Milestone-13 — lapsed
- Diversion of 0.9 Ha Forest Land at Pangolakha Life Life Sanctuary for… — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.