Quick answers
What is Residential project by M/s. Subishi Projects?
This approved residential project by M/s. Subishi Projects is in Devanpalli, Kamareddy, Telangana. It plans 83 units of up to 3 floors on 7.4 acres.
Who is building it?
The applicant is Subishi Projects.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Feb 2025), as of 27 Nov 2026.
Where is it?
In Devanpalli, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹75 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 6 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Feb 2025 |
| Application filed | 6 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Subishi Projects |
| Use | Residential |
| Units | 83 |
| Floors (tallest) | 3 |
| Land area | 7.4 acres (3 ha) |
| Built-up area | 27,740 m² (2,98,591 sq ft) |
| Plot area | 30,148 m² (3,24,510 sq ft) |
| Project cost | ₹75 crore |
| Village / locality | Devanpalli |
| Taluk / tehsil | Kamareddy |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02042 |
In context
5 applications in Kamareddy since January 2022 are in the same category (Buildings & townships): 1 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Devanpalli, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Sapthagiri Mines & Minerals,22.70 Ha, Laterite Mine, Survey… — cleared for impact study, 10.2 km away
- Proposals for Diversion of Forest Land to an Extent of 0.0521 Ha in Khannapur… — in-principle approval, conditions pending, 12.4 km away
- Asst. Director of Mines & Geology Kamareddy Telangana State — environmental approval granted, 12.4 km away
- Drilling of Boreholes and Geo Technical Works (Pits) for Execution of the… — initial checks, 12.8 km away
- Proposed Manufacture 199 KLPD Ethanol (Grain based distillery) by M/s Vivek… — environmental approval granted, 13.7 km away
- Laying of Optical Fibre Cable between Havelighanpur-Tippapur along the road… — decision issued, 14 km away
- Laying of Railway doubling line between Mudkhed to Medchal stations, passing… — more information requested, 14.1 km away
- Sri Cheela Narender – 2.852 Ha — environmental approval granted, 14.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.