What is this project?
Greenfield Project of Grain Based Distillery Plant of 200 KLD by M/s Gayathri Renewable Fuels and Allied Industries Pvt. Ltd is an approved industrial project in Pedda Dhanavadu, Rajoli, Jogulamba Gadwal, Telangana. The site covers 19.2 acres.
Who is building it?
The applicant is Gayathri Renewable Fuels and Allied Industries Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Apr 2023), as of 27 Nov 2026.
Where is it?
In Pedda Dhanavadu, Rajoli, Jogulamba Gadwal, Telangana.
How big is it?
It has a stated cost of ₹220.6 crore and a site of 19.2 acres.
When was it filed?
The application was filed on 13 Apr 2023.
Project details
| Official title | Greenfield Project of Grain Based Distillery Plant of 200 KLD along with Co-Generation Power Plant of 4.5 MW at Survey No. 174/A/1, 174/1, 174/A1, 174/A2, 174/B, 174/B2 at Village- Pedda Dhanwada, Tehsil- Rajoli Mandal, District- Jogulamba Gadwal, Telangana by M/s Gayathri Renewable Fuels and Allied Industries Pvt. Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Apr 2023 |
| Application filed | 13 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Gayathri Renewable Fuels and Allied Industries Private Limited |
| Land area | 19.2 acres (7.8 ha) |
| Project cost | ₹220.6 crore |
| Village / locality | Pedda Dhanavadu |
| Taluk / tehsil | Rajoli |
| District | Jogulamba Gadwal |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00599 |
Where it is
Pedda Dhanavadu, Rajoli, Jogulamba Gadwal, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Stone & Metal Quarry of Sri. U. Krishna Murthy — environmental approval granted, 7.4 km away
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., (M/s MEIL… — lapsed, 9.3 km away
- For Proposed "Enhancement in Rectified Spirit / ENA / Ethanol / Pharma Grade… — initial checks, 24.7 km away
- Sri B. Venkateshwar Reddy — environmental approval granted, 28.7 km away
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., (M/s. MEIL… — lapsed, 30.2 km away
- Stone and Metal Quarry of Sri A. Prabhakar Reddy — lapsed, 36.8 km away
- Building Stone & Road Metal Quarry of M/s. Sri Venkateshwara Stone Crusher — under environmental review, 39.2 km away
- Mining project by M/s Sri Venkateshwara Stone Crusher — lapsed, 39.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.