Quick answers
What is this project?
M/s Venkateshwara Stone Crusher, Building Stone and Road Metal Mine,1.0Ha, Sy.No.859,Fathepur Village,Chilpur Mandal, Jangaon District, Telangana is an approved mining project in Fatepur, Chilpur, Jangoan, Telangana. The site covers 2.5 acres.
Who is building it?
The applicant is Banoth Venkatram.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 May 2025), as of 27 Nov 2026.
Where is it?
In Fatepur, Chilpur, Jangoan, Telangana.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 1 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 May 2025 |
| Application filed | 1 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Banoth Venkatram |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Fatepur |
| Taluk / tehsil | Chilpur |
| District | Jangoan |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01398 |
In context
38 applications in Jangoan since January 2022 are in the same category (Mining): 32 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 89% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Fatepur, Chilpur, Jangoan, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed to Conduct Other Than Fully Mechanized Opencast Mining Method… — environmental approval granted, 6.4 km away
- Katta Stones — environmental approval granted, 6.5 km away
- M/s. Smt. Kunduru Usha Reddy, Mining of Gravel over an extent of 1.22 Ha. in… — environmental approval granted, 7 km away
- M/s. Smt. Venumuddala Ramadevi, Mining of Gravel over an extent of 1.62 Ha. in… — lapsed, 7.2 km away
- Mining project by M/s. R.K. Stone Crusher - 2.00 Ha — environmental approval granted, 7.9 km away
- Mining project by M/s. R.K. Stone Crusher - 2.00 Ha — environmental approval granted, 8.1 km away
- Sri Rounith Rao Malyala-Gravel quarry - 1.214 ha -Production @ 50550 m3/Year — environmental approval granted, 8.9 km away
- Diversion Of 0.1072 Ha of Forest Land for Laying of Optical Fiber Cable along… — initial checks, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.