Quick answers
What is this project?
Sri. Bera Kailash ,Road Metal and Building Stone Mine, 4.047 Ha, Sy.No.66 ,Chinthal Sangvi Village, Bazarhathnur Mandal, Adilabad, Telangana is an approved mining project in Chintala Sangvi, Bazarhatnoor, Adilabad, Telangana. The site covers 10 acres.
Who is building it?
The applicant is Bera Kailash.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Mar 2025), as of 27 Nov 2026.
Where is it?
In Chintala Sangvi, Bazarhatnoor, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹25 lakh and a site of 10 acres.
When was it filed?
The application was filed on 28 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Mar 2025 |
| Application filed | 28 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bera Kailash |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Chintala Sangvi |
| Taluk / tehsil | Bazarhatnoor |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02041 |
In context
14 applications in Adilabad since January 2022 are in the same category (Mining): 12 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 10 acres, this one is larger than 71% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Chintala Sangvi, Bazarhatnoor, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project Adb Div — lapsed, 6.3 km away
- 4g Saturation Project Adb Div — lapsed, 6.3 km away
- 4g Saturation Project Adb Div — lapsed, 6.3 km away
- 4g Saturation Project Adb Div — lapsed, 6.3 km away
- Diversion of 3.2525 ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 9.1 km away
- Water and irrigation project by Greenko TG01 IREP Private Limited — cleared for impact study, 10.4 km away
- Greenko TS01 Off-Stream Closed Loop Pumped Storage Project (750 MW) — cleared for impact study, 10.4 km away
- Diversion of 3.2525 ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.