Quick answers
What is 4g Saturation Project Adb Div?
4g Saturation Project Adb Div is a lapsed project in Girjai, Bazarhatnoor, Adilabad, Telangana. The site covers 0 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Girjai, Bazarhatnoor, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0 acres and 250 m² of forest land.
When was it filed?
The application was filed on 1 Aug 2023.
One of 4 filings for this project. The project's main page, with every filing and where each stands: 4g Saturation Project Adb Div
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 1 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 200 m² |
| Forest land | 250 m² |
| Project cost | ₹80 lakh |
| Village / locality | Girjai |
| Taluk / tehsil | Bazarhatnoor |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04251 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Aug 2023 | Lapsed | 0 acres | ₹80 lakh |
| New project filed 2 Aug 2023 | Lapsed | 0 acres | ₹80 lakh |
| New project filed 2 Aug 2023 | Lapsed | 0 acres | ₹80 lakh |
| New project filed 1 Aug 2023 (this page) | Lapsed | 0 acres | ₹80 lakh |
In context
8 applications in Adilabad since January 2022 are in the same category (Other): 0 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Girjai, Bazarhatnoor, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project Adb Div — lapsed, 0 m away
- 4g Saturation Project Adb Div — lapsed, 0 m away
- 4g Saturation Project Adb Div — lapsed, 0 m away
- Greenko TS01 Off-Stream Closed Loop Pumped Storage Project (750 MW) — cleared for impact study, 4.5 km away
- Water and irrigation project by Greenko TG01 IREP Private Limited — cleared for impact study, 4.5 km away
- Sri. Bera Kailash ,Road Metal and Building Stone Mine, 4.047 Ha, Sy.No.66… — environmental approval granted, 6.3 km away
- M/s. Tirumala Road Liners. — environmental approval granted, 15.1 km away
- Assistant Director of Mines and Geology - Adilabad - 1 Ha., — environmental approval granted, 15.1 km away
4 Bharat Sanchar Nigam (BSNL) projects in Adilabad
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.