Quick answers
What is this project?
Diversion of 3.2525 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Ajjar Wajjar, Dedra, Harkai, Kadam, Kokannagutta, Nagmalia, Neredugonda, Raghunathapur, Sirichelma and Waghdari RF of Echoda Division is a proposed road project in Koratkal Khurd, Neradigonda, Adilabad, Telangana. The site covers 8 acres.
Who is building it?
The applicant is Telangana Fiber Grid Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Koratkal Khurd, Neradigonda, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹77 lakh and a site of 8 acres.
When was it filed?
The application was filed on 14 Jun 2023.
Project details
| Official title | Diversion of 3.2525 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Ajjar Wajjar, Dedra, Harkai, Kadam, Kokannagutta, Nagmalia, Neredugonda, Raghunathapur, Sirichelma and Waghdari RF of Echoda Division in Adilabad District, Telangana State in favour of Telangana Fiber Grid Corporation Ltd. |
|---|---|
| Status | More information requested |
| Status since | 14 Jun 2023 |
| Application filed | 14 Jun 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Telangana Fiber Grid Corporation Limited |
| Land area | 8 acres (3.3 ha) |
| Project cost | ₹77 lakh |
| Village / locality | Koratkal Khurd |
| Taluk / tehsil | Neradigonda |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04433 |
In context
20 applications in Adilabad since January 2022 are in the same category (Roads & highways): 1 approved, 14 filed or under review, and 5 withdrawn, lapsed or rejected. At 8 acres, this one is larger than 75% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koratkal Khurd, Neradigonda, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 3.2525 ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review, 2.9 km away
- Diversion of 3.2525 ha of Forest Land proposal for laying of Optical Fiber… — under forest review, 2.9 km away
- Diversion of 3.2525 ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 4.3 km away
- Sri. Bera Kailash ,Road Metal and Building Stone Mine, 4.047 Ha, Sy.No.66… — environmental approval granted, 12.4 km away
- 0.500 Ha. Road Metal & Building Stone of M/s. Sharp Stone Crusher.,… — environmental approval granted, 12.8 km away
- Diversion of 0.40835 Ha of Forest Land for Construction of 4G Mobile Tower and… — forest land use approved, 14.2 km away
- Implementation of Advanced Traffic Management System (Atms) Work Through "land… — initial checks, 15.3 km away
- Diversion of 1.764 Ha of Forest Land in Echoda Division for Upgradation and… — under wildlife review, 17 km away
More from Telangana Fiber Grid Corporation Limited in Adilabad
- Diversion of 4.0480 ha of Forest Land proposal for laying of Optical Fiber… — more information requested
- Diversion of 3.2525 ha of Forest Land proposal for laying of Optical Fiber… — under forest review
- Diversion of 3.2525 ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review
- Diversion of 4.0480 ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review
- Diversion of 7.6593 ha (Revised from 7.7487 Ha) of Forest Land for Laying of… — more information requested
- Diversion of 3.2525 ha of Forest Land for laying of Optical Fiber Cable along… — lapsed
8 Telangana Fiber Grid Corporation projects in Adilabad
All 79 Telangana Fiber Grid Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.