Quick answers
What is this project?
Proposals for Diversion of Forest Land to an Extent of 0.0521 Ha in Khannapur Rf of Kamareddy Forest Division Under Kamareddy District for Laying of Ofc Cables Along the Nizamsagar to Sadashiv Nagar Route Road and Within the Existing Right of Way in Favour of M/S Vindhya Telelinks Limited is a proposed telecom project in Kannapur, Ramareddy, Kamareddy, Telangana. The site covers 0.1 acres.
Who is building it?
The applicant is M/S Vindhya Telelinks Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Kannapur, Ramareddy, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.1 acres and 520 m² of forest land.
When was it filed?
The application was filed on 27 May 2024.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 14 Aug 2026 |
| Application filed | 27 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | M/S Vindhya Telelinks Limited |
| Land area | 500 m² |
| Forest land | 520 m² |
| Project cost | ₹7 lakh |
| Village / locality | Kannapur |
| Taluk / tehsil | Ramareddy |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03883 |
In context
9 applications in Kamareddy since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Kannapur, Ramareddy, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Cheela Narender – 2.852 Ha — environmental approval granted, 9 km away
- Drilling of Boreholes and Geo Technical Works (Pits) for Execution of the… — initial checks, 9.7 km away
- Laying of Railway doubling line between Mudkhed to Medchal stations, passing… — more information requested, 12.1 km away
- Building project by M/s. Subishi Projects — environmental approval granted, 12.4 km away
- Erection of 11 KV Electric Line on Kacha Road for Agriculture Purpose — lapsed, 18.9 km away
- Proposed Building Stone & Road Metal Quarry of M/s. Sri Rama Stone Crusher — environmental approval granted, 19.8 km away
- Diversion of 0.8777 Ha of Forest land for Laying of Drinking Water pipeline… — lapsed, 20.1 km away
- Submission of No Increase in Pollution Load for the proposed Change of Product… — initial checks, 20.5 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.