Quick answers
What is this project?
"Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Compartment No:260,261 of Damarvai-II Beat, Tavai RF, in Tadwai WL Range in Eturnagaram Division is a lapsed telecom project in Banjarellapur, Tadvai, Mulugu, Telangana. The site covers 0.3 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 5 Oct 2026, so it is no longer under consideration.
Where is it?
In Banjarellapur, Tadvai, Mulugu, Telangana.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.3 acres and 1,130 m² of forest land.
When was it filed?
The application was filed on 23 Jul 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along the road…
Project details
| Official title | "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Compartment No:260,261 of Damarvai-II Beat, Tavai RF, in Tadwai WL Range in Eturnagaram Division in Mulugu District Telangana State in favour of M/s Bharti Airtel Limited." |
|---|---|
| Status | Lapsed |
| Status since | 5 Oct 2026 |
| Application filed | 23 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 1,100 m² |
| Forest land | 1,130 m² |
| Project cost | ₹7 lakh |
| Village / locality | Banjarellapur |
| Taluk / tehsil | Tadvai |
| District | Mulugu |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03824 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Jul 2026 (this page) | Lapsed | 0.3 acres | ₹7 lakh |
| New project filed 23 Jul 2026 | More information requested | 0.3 acres | ₹7 lakh |
In context
13 applications in Mulugu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 80% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banjarellapur, Tadvai, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 0 m away
- For Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road… — lapsed, 0 m away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 2 km away
- Diversion of 0.9629 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 3.6 km away
- Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road… — lapsed, 5.7 km away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 6.1 km away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — decision issued, 6.1 km away
- Diversion of 1.8850 Ha revised from 2.0175 ha of Forest Land for laying of… — more information requested, 6.6 km away
More from Bharti Airtel Limited in Mulugu
3 Bharti Airtel (Airtel) projects in Mulugu
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.