Quick answers
What is this project?
Diversion of 0.9629 Ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Compartment No:Ban342,Bee 655 Beerelly (KAMARAM) Beat & Compartment No:8, Man 6 & Man 9 of Komatipally East & west Beats, Compartment No:Man10 & 12 Kothuru Beat, Compartment No:5 Man 4 B Mangapet North& South Beat, Compartment No:DAMA 2C Pulusubandha Beat Compartment No:326 & 328 Rampur (South). Compartment No:337 & 338 Veerapur Beat, Compartment No:339 Venkannapuram Beat in Bandal is a lapsed telecom project in Banjarellapur, Tadvai, Mulugu, Telangana. The site covers 2.4 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 5 Oct 2026, so it is no longer under consideration.
Where is it?
In Banjarellapur, Tadvai, Mulugu, Telangana.
How big is it?
It has a stated cost of ₹55 lakh; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 1 Aug 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Oct 2026 |
| Application filed | 1 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Banjarellapur |
| Taluk / tehsil | Tadvai |
| District | Mulugu |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04318 |
In context
13 applications in Mulugu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected. At 2.4 acres, this one is larger than 50% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banjarellapur, Tadvai, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 2.9 km away
- For Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road… — lapsed, 3.6 km away
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 3.6 km away
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 3.6 km away
- Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road… — lapsed, 6 km away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 6.6 km away
- Diversion of 1.8850 Ha revised from 2.0175 ha of Forest Land for laying of… — more information requested, 6.8 km away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 9.4 km away
More from Bharti Airtel Limited in Mulugu
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed
3 Bharti Airtel (Airtel) projects in Mulugu
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.