Quick answers
What is this project?
Laying of Optical Fibre Cable between Havelighanpur-Tippapur along the road within the existing RoW under Kamareddy Division for 0.1023 Ha in Telangana State is an approved telecom project in Argonda, Rajampet, Kamareddy, Telangana. The site covers 0.2 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 May 2026), as of 27 Nov 2026.
Where is it?
In Argonda, Rajampet, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹5 lakh; a site of 0.2 acres and 1,020 m² of forest land.
When was it filed?
The application was filed on 2 Apr 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 2 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 1,000 m² |
| Forest land | 1,020 m² |
| Project cost | ₹5 lakh |
| Village / locality | Argonda |
| Taluk / tehsil | Rajampet |
| District | Kamareddy |
| State | Telangana |
| Location from | Site area on record |
| Our reference | WID-TG-03862 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Apr 2024 (this page) | Forest land use approved | 0.2 acres | ₹5 lakh |
| New project filed 2 Jan 2024 | Decision issued | 0.2 acres | ₹5 lakh |
In context
9 applications in Kamareddy since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Argonda, Rajampet, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Optical Fibre Cable between Havelighanpur-Tippapur along the road… — decision issued, 200 m away
- Request for Transfer of Environmental Clearance from M/s. Raghava Life… — under environmental review, 10.6 km away
- Submission of No Increase in Pollution Load for the proposed Change of Product… — initial checks, 10.8 km away
- M/s Sapthagiri Mines & Minerals,22.70 Ha, Laterite Mine, Survey… — cleared for impact study, 12.8 km away
- Proposed Building Stone & Road Metal Quarry of M/s. Sri Rama Stone Crusher — environmental approval granted, 13.3 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — forest land use approved, 13.5 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — decision issued, 13.5 km away
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — lapsed, 14.1 km away
More from Jio Digital Fiber Private Limited in Kamareddy
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — forest land use approved
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — decision issued
- Laying of Optical Fibre Cable between Degulawadi-Kheemraj Kallali along the… — forest land use approved
- Laying of Optical Fibre Cable between Degulawadi-Kheemraj Kallali along the… — lapsed
- Laying of Optical Fibre Cable Between Gurjal-Yellaram Along the Road Within… — lapsed
7 Jio Digital Fibre projects in Kamareddy
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.