What is Developing? Open the mapMap

Initial checksRoads & highways · Adilabad, Telangana

Implementation of Advanced Traffic Management System (Atms) Work Through "land Use Change in the Already Diverted 116.56 Ha. of Forest Land in Different R.Fs of Adilabad & Nirmal Division for Up Gradation of the Existing Road From 2 Lanes to 4/6 Lanes From M.H./Ap Boarder to Islamngar to Kadtal (Km 175 to Km 308) in Nagpur to Hyderabad Section of Nh-44(Old NH-7)

Implementation of Advanced Traffic Management System (Atms) Work Through "land Use Change in the Already Diverted 116.56 Ha. of Forest Land in Different R.Fs of Adilabad & Nirmal Division for Up Gradation of the Existing Road From 2 Lanes to 4/6 Lanes From M.H./Ap Boarder to Islamngar to Kadtal (Km 175 to Km 308) in Nagpur to Hyderabad Section of Nh-44(Old NH-7) is a proposed road project in Kupti Khurd, Neradigonda, Adilabad, Telangana. The site covers 0.1 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Initial checks” (since 14 Oct 2026).

See it on the live map All projects in Adilabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Implementation of Advanced Traffic Management System (Atms) Work Through "land Use Change in the Already Diverted 116.56 Ha. of Forest Land in Different R.Fs of Adilabad & Nirmal Division for Up Gradation of the Existing Road From 2 Lanes to 4/6 Lanes From M.H./Ap Boarder to Islamngar to Kadtal (Km 175 to Km 308) in Nagpur to Hyderabad Section of Nh-44(Old NH-7) is a proposed road project in Kupti Khurd, Neradigonda, Adilabad, Telangana. The site covers 0.1 acres.

Who is building it?

The applicant is National Highway Authority of India.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Kupti Khurd, Neradigonda, Adilabad, Telangana.

How big is it?

It has a stated cost of ₹1.3 crore; a site of 0.1 acres and 260 m² of forest land.

When was it filed?

The application was filed on 13 Oct 2026.

Project details

Official titleImplementation of Advanced Traffic Management System (Atms) Work Through "land Use Change in the Already Diverted 116.56 Ha. of Forest Land in Different R.Fs of Adilabad & Nirmal Division for Up Gradation of the Existing Road From 2 Lanes to 4/6 Lanes From M.H./Ap Boarder to Islamngar to Kadtal (Km 175 to Km 308) in Nagpur to Hyderabad Section of Nh-44(Old NH-7) in Adilabad District in Favour of National Highways Authority of India (NHAI)"
StatusInitial checks
Status since14 Oct 2026
Application filed13 Oct 2026
Approval soughtForest land use
Application typeChange of use
SectorRoads & highways
ApplicantNational Highway Authority of India
Land area300 m²
Forest land260 m²
Project cost₹1.3 crore
Village / localityKupti Khurd
Taluk / tehsilNeradigonda
DistrictAdilabad
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03962

In context

20 applications in Adilabad since January 2022 are in the same category (Roads & highways): 1 approved, 14 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kupti Khurd, Neradigonda, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.