Quick answers
What is this project?
Implementation of Advanced Traffic Management System (Atms) Work Through "land Use Change in the Already Diverted 116.56 Ha. of Forest Land in Different R.Fs of Adilabad & Nirmal Division for Up Gradation of the Existing Road From 2 Lanes to 4/6 Lanes From M.H./Ap Boarder to Islamngar to Kadtal (Km 175 to Km 308) in Nagpur to Hyderabad Section of Nh-44(Old NH-7) is a proposed road project in Kupti Khurd, Neradigonda, Adilabad, Telangana. The site covers 0.1 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Kupti Khurd, Neradigonda, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹1.3 crore; a site of 0.1 acres and 260 m² of forest land.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Official title | Implementation of Advanced Traffic Management System (Atms) Work Through "land Use Change in the Already Diverted 116.56 Ha. of Forest Land in Different R.Fs of Adilabad & Nirmal Division for Up Gradation of the Existing Road From 2 Lanes to 4/6 Lanes From M.H./Ap Boarder to Islamngar to Kadtal (Km 175 to Km 308) in Nagpur to Hyderabad Section of Nh-44(Old NH-7) in Adilabad District in Favour of National Highways Authority of India (NHAI)" |
|---|---|
| Status | Initial checks |
| Status since | 14 Oct 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 300 m² |
| Forest land | 260 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Kupti Khurd |
| Taluk / tehsil | Neradigonda |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03962 |
In context
20 applications in Adilabad since January 2022 are in the same category (Roads & highways): 1 approved, 14 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kupti Khurd, Neradigonda, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.764 Ha of Forest Land in Echoda Division for Upgradation and… — under wildlife review, 1.8 km away
- Diversion of 0.40835 Ha of Forest Land for Construction of 4G Mobile Tower and… — forest land use approved, 2.3 km away
- 6MW Mini Hydel Project at Kuntala Water Fall for Producing of Non Conventional… — lapsed, 7.4 km away
- 6MW Mini Hydel Project at Kuntala Water Fall for Producing of Non Conventional… — more information requested, 7.4 km away
- Diversion of 3.2525 ha of Forest Land proposal for laying of Optical Fiber… — under forest review, 12.6 km away
- Diversion of 3.2525 ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review, 12.6 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — lapsed, 13.9 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply by Laying of Abc… — more information requested, 13.9 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.