One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along the Road…
Project details
| Official title | Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Forest Land in Nidigal, Nellikal and Rajavaram RF of Nagarjunasagar Division in Nalgonda District in Telangana State in favour of Telangana fiber grid corporation Ltd |
|---|---|
| Status | Lapsed |
| Status since | 2 Nov 2026 |
| Application filed | 30 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Telangana Fiber Grid Corporation Limited |
| Land area | 7.1 acres (2.9 ha) |
| Forest land | 7.1 acres (2.9 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Bolaram |
| Taluk / tehsil | Chandampeta |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04092 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jun 2023 | Under wildlife review | 7.1 acres | ₹86 lakh |
| New project filed 30 May 2023 (this page) | Lapsed | 7.1 acres | ₹86 lakh |
In context
7 applications in Nalgonda since January 2022 are in the same category (Telecom): 2 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bolaram, Chandampeta, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 0 m away
- 4G Saturation project — in-principle approval, conditions pending, 650 m away
- Diversion of 16.3327 Ha of Forest Land to Irrigation Department Towards… — more information requested, 3.8 km away
- Diversion of 16.3327 Ha of Forest Land to Irrigation Department Towards… — more information requested, 3.8 km away
- Laying of Pipeline and Structures for Lift Irrigation Scheme at Kambalapally… — more information requested, 5.8 km away
- Laying of Pipeline and Structures for Lift Irrigation Scheme at Kambalapally… — lapsed, 5.8 km away
- Laying of Pipeline and structures for Lift Irrigation Scheme at Kambalapally… — lapsed, 6.2 km away
- 4G Saturation project — more information requested, 7 km away
More from Telangana Fiber Grid Corporation Limited in Nalgonda
- Diversion of 0.8325 ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved
3 Telangana Fiber Grid Corporation projects in Nalgonda
All 79 Telangana Fiber Grid Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.