One of 2 filings for this project. The project's main page, with every filing and where each stands: 4G Saturation project
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Nov 2023 |
| Application filed | 3 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 1,900 m² |
| Project cost | ₹3 crore |
| Village / locality | Dasarapalli |
| Taluk / tehsil | Neredugommu |
| District | Nalgonda |
| State | Telangana |
| Location from | Site area on record |
| Our reference | WID-TG-04400 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Nov 2023 (this page) | More information requested | 0.5 acres | ₹3 crore |
| New project filed 21 Aug 2023 | In-principle approval, conditions pending | 0.2 acres | ₹3 crore |
In context
11 applications in Nalgonda since January 2022 are in the same category (Other): 0 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 82% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dasarapalli, Neredugommu, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Pipeline and Structures for Lift Irrigation Scheme at Kambalapally… — more information requested, 1.3 km away
- Laying of Pipeline and Structures for Lift Irrigation Scheme at Kambalapally… — lapsed, 1.3 km away
- Laying of Pipeline and structures for Lift Irrigation Scheme at Kambalapally… — lapsed, 3.1 km away
- Diversion of 16.3327 Ha of Forest Land to Irrigation Department Towards… — more information requested, 3.5 km away
- Diversion of 16.3327 Ha of Forest Land to Irrigation Department Towards… — more information requested, 3.5 km away
- 4G Saturation project — in-principle approval, conditions pending, 6.4 km away
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 7 km away
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — lapsed, 7 km away