Diversion of 5.2947 ha of Forest Land proposal for laying of Optical Fiber Cable along the road in Various Reserve Forests of Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Forest Division

Diversion of 5.2947 ha of Forest Land proposal for laying of Optical Fiber Cable along the road in Various Reserve Forests of Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Forest Division is a proposed telecom project in Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana. The site covers 12.8 acres. Its stated project cost is ₹2.1 crore. As of 27 Nov 2026, its status is “More information requested” (since 2 Nov 2026).

See it on the live map All projects in Mulugu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 5.2947 ha of Forest Land proposal for laying of Optical Fiber Cable along the road in Various Reserve Forests of Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Forest Division is a proposed telecom project in Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana. The site covers 12.8 acres.

Who is building it?

The applicant is Telangana Fiber Grid Corporation Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana.

How big is it?

It has a stated cost of ₹2.1 crore; a site of 12.8 acres and 12.8 acres (5.2 ha) of forest land.

When was it filed?

The application was filed on 19 Aug 2024.

Project details

Official titleDiversion of 5.2947 ha of Forest Land proposal for laying of Optical Fiber Cable along the road in Various Reserve Forests of Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Forest Division in Mulugu District, Telangana State in favour of Telangana Fiber Grid Corporation Ltd.
StatusMore information requested
Status since2 Nov 2026
Application filed19 Aug 2024
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantTelangana Fiber Grid Corporation Limited
Land area12.8 acres (5.2 ha)
Forest land12.8 acres (5.2 ha)
Project cost₹2.1 crore
Village / localityAkulavari Ghanapuram
Taluk / tehsilEturunagaram
DistrictMulugu
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-04110

In context

13 applications in Mulugu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected. At 12.8 acres, this one is larger than 90% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Telangana Fiber Grid Corporation Limited in Mulugu

9 Telangana Fiber Grid Corporation projects in Mulugu
All 79 Telangana Fiber Grid Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.