LapsedTelecom · Mulugu, Telangana

Diversion of 5.2947 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Division

Diversion of 5.2947 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Division is a lapsed telecom project in Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana. It seeks 13.1 acres of forest land. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 27 Apr 2026).

See it on the live map All projects in Mulugu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 5.2947 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Division is a lapsed telecom project in Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana. It seeks 13.1 acres of forest land.

Who is building it?

The applicant is Telangana Fiber Grid Corporation Limited.

Has it been approved?

No. The application was lapsed on 27 Apr 2026, so it is no longer under consideration.

Where is it?

In Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana.

How big is it?

It has a stated cost of ₹1.2 crore and 13.1 acres (5.3 ha) of forest land.

When was it filed?

The application was filed on 23 Jun 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 5.2947 ha of Forest Land for laying of Optical Fiber Cable along the road…

Project details

Official titleDiversion of 5.2947 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Banojibandam Ext, Chitya l, Dodla, Kamaram Ext, Kamaram_ii, Kondaparthy Ext., Manasapally Ext., Rampur Ext., Rajannapet Ext., Padgepur, Shapally EXT_II, Singaram south and Tadwai RF of Eturunagaram Division in Mulugu District, Telangana State in favour of Telangana Fiber Grid Corporation Ltd.
StatusLapsed
Status since27 Apr 2026
Application filed23 Jun 2023
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantTelangana Fiber Grid Corporation Limited
Forest land13.1 acres (5.3 ha)
Project cost₹1.2 crore
Village / localityAkulavari Ghanapuram
Taluk / tehsilEturunagaram
DistrictMulugu
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-04113

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jun 2023More information requested₹1.2 crore
New project filed 23 Jun 2023 (this page)Lapsed₹1.2 crore

In context

13 applications in Mulugu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Akulavari Ghanapuram, Eturunagaram, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Telangana Fiber Grid Corporation Limited in Mulugu

9 Telangana Fiber Grid Corporation projects in Mulugu
All 79 Telangana Fiber Grid Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.