What is Developing? Open the mapMap

More information requestedRoads & highways · Mulugu, Telangana

Diversion Of 1.9375 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Laxmidevipet, Jakaram-I, Plampet, Ramappa-I, Ramappa-II, Venkatapur, Venkatapur-I and II, Singaram south and Pakhal RF of Mulugu Division of Mulugu District in Telangana State in favour of Telangana fiber grid corporation Ltd

Diversion Of 1.9375 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Laxmidevipet, Jakaram-I, Plampet, Ramappa-I, Ramappa-II, Venkatapur, Venkatapur-I and II, Singaram south and Pakhal RF of Mulugu Division of Mulugu District in Telangana State in favour of Telangana fiber grid corporation Ltd is a proposed road project in Ramachandrapur, Mulug, Mulugu, Telangana. The site covers 4.8 acres. Its stated project cost is ₹86 lakh. As of 27 Nov 2026, its status is “More information requested” (since 16 Jun 2023).

See it on the live map All projects in Mulugu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion Of 1.9375 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Laxmidevipet, Jakaram-I, Plampet, Ramappa-I, Ramappa-II, Venkatapur, Venkatapur-I and II, Singaram south and Pakhal RF of Mulugu Division of Mulugu District in Telangana State in favour of Telangana fiber grid corporation Ltd is a proposed road project in Ramachandrapur, Mulug, Mulugu, Telangana. The site covers 4.8 acres.

Who is building it?

The applicant is Telangana Fiber Grid Corporation Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Ramachandrapur, Mulug, Mulugu, Telangana.

How big is it?

It has a stated cost of ₹86 lakh and a site of 4.8 acres.

When was it filed?

The application was filed on 16 Jun 2023.

Project details

Official titleDiversion Of 1.9375 Ha of Forest Land for Laying of Optical Fiber Cable along the Road Within the Existing Row in Forest Land in Laxmidevipet, Jakaram-I, Plampet, Ramappa-I, Ramappa-II, Venkatapur, Venkatapur-I and II, Singaram south and Pakhal RF of Mulugu Division of Mulugu District in Telangana State in favour of Telangana fiber grid corporation Ltd.
StatusMore information requested
Status since16 Jun 2023
Application filed16 Jun 2023
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantTelangana Fiber Grid Corporation Limited
Land area4.8 acres (1.9 ha)
Project cost₹86 lakh
Village / localityRamachandrapur
Taluk / tehsilMulug
DistrictMulugu
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-04383

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Jun 2023 (this page)More information requested4.8 acres₹86 lakh
New project filed 21 Feb 2023Lapsed₹86 lakh

In context

18 applications in Mulugu since January 2022 are in the same category (Roads & highways): 0 approved, 10 filed or under review, and 7 withdrawn, lapsed or rejected. At 4.8 acres, this one is larger than 53% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ramachandrapur, Mulug, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Telangana Fiber Grid Corporation Limited in Mulugu

9 Telangana Fiber Grid Corporation projects in Mulugu
All 79 Telangana Fiber Grid Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.