Quick answers
What is this project?
Erection of 11 KV Electric Line on Kacha Road for Agriculture Purpose is a lapsed building project in Lachapet, Machareddy, Kamareddy, Telangana. The site covers 0.7 acres.
Who is building it?
The applicant is Anand Beerelli.
Has it been approved?
No. The application was lapsed on 7 Feb 2024, so it is no longer under consideration.
Where is it?
In Lachapet, Machareddy, Kamareddy, Telangana.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.7 acres and 3,010 m² of forest land.
When was it filed?
The application was filed on 4 Apr 2023.
Project details
| Official title | Erection of 11 KV Electric Line on Kacha Road for Agriculture Purpose in Lachapet Village, Machareddy Mandal of Kamareddy District |
|---|---|
| Status | Lapsed |
| Status since | 7 Feb 2024 |
| Application filed | 4 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Anand Beerelli |
| Land area | 3,000 m² |
| Forest land | 3,010 m² |
| Project cost | ₹7 lakh |
| Village / locality | Lachapet |
| Taluk / tehsil | Machareddy |
| District | Kamareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04322 |
In context
5 applications in Kamareddy since January 2022 are in the same category (Buildings & townships): 1 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Lachapet, Machareddy, Kamareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone & Road Metal Quarry of Sri Kesireddy Ashok Reddy — lapsed, 7.1 km away
- Sri. Kesireddy Ashok Reddy - 2.570 Ha — environmental approval granted, 7.1 km away
- Assistant Director of Mines & Geology Kamareddy — environmental approval granted, 7.1 km away
- Sri Cheela Narender – 2.852 Ha — environmental approval granted, 10.8 km away
- Proposed Building Stone & Road Metal Quarry of M/s. Sri Rama Stone Crusher — environmental approval granted, 15.9 km away
- Mining project by M/s. Narasimha Stone Crusher — environmental approval granted, 18.2 km away
- Mining project by M/s. Narsimha Stone Crusher — environmental approval granted, 18.3 km away
- Submission of No Increase in Pollution Load for the proposed Change of Product… — initial checks, 18.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.