Quick answers
What is Rough Stone and Gravel Quarry of Thiru.C.Murugesan?
Rough Stone and Gravel Quarry of Thiru.C.Murugesan is an approved mining project in Uthumalai, Veerakeralamputhur, Tenkasi, Tamil Nadu. The site covers 2.8 acres.
Who is building it?
The applicant is Chidambara Murugesan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Nov 2022), as of 27 Nov 2026.
Where is it?
In Uthumalai, Veerakeralamputhur, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹64 lakh and a site of 2.8 acres.
When was it filed?
The application was filed on 2 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Nov 2022 |
| Application filed | 2 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chidambara Murugesan |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Uthumalai |
| Taluk / tehsil | Veerakeralamputhur |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00206 |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.8 acres, this one is smaller than 88% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Uthumalai, Veerakeralamputhur, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. T. Ravichadran — environmental approval granted, 6.5 km away
- Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry — environmental approval granted, 8.1 km away
- Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry — cleared for impact study, 8.1 km away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 8.2 km away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 8.2 km away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — cleared for impact study, 8.2 km away
- Rough Stone, Jelly and Gravel Quarry of Thiru.R.Ponkaliraj — environmental approval granted, 8.5 km away
- Earth Quarry of Tvl.DPS Constructions, By its Prop.Thiru.D.Perumalsamy — environmental approval granted, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.