Quick answers
What is Power project by Nlc Tamilnadu Power Limited?
This approved power project by Nlc Tamilnadu Power Limited is in Mullakkadu, Thoothukkudi, Tamil Nadu. The site covers 601.6 acres.
Who is building it?
The applicant is Nlc Tamilnadu Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Jan 2026), as of 27 Nov 2026.
Where is it?
In Mullakkadu, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹7,293.5 crore and a site of 601.6 acres.
When was it filed?
The application was filed on 10 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Power project by Nlc Tamilnadu Power Limited
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Jan 2026 |
| Application filed | 10 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Nlc Tamilnadu Power Limited |
| Land area | 601.6 acres (243.5 ha) |
| Project cost | ₹7,293.5 crore |
| Village / locality | Mullakkadu |
| Taluk / tehsil | Thoothukkudi |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00344 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 1 Oct 2024 | Environmental approval granted | 601.6 acres | ₹7,293.5 crore |
| Amendment filed 10 Jun 2023 (this page) | Environmental approval granted | 601.6 acres | ₹7,293.5 crore |
In context
15 applications in Thoothukkudi since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 601.6 acres, this one is smaller than 77% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mullakkadu, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power project by NLC Tamil Nadu Power Limited — returned to applicant, 0 m away
- Power project by Nlc Tamilnadu Power Limited — environmental approval granted, 0 m away
- P. Ananthakumar Rough Stone and Gravel Quarry Project Extent: 3.86.0ha… — environmental approval granted, 3.1 km away
- P. Ananthammal Rough Stone and Gravel Quarry Extent: 1.62.0ha S.F.No. 457/5 of… — environmental approval granted, 3.2 km away
- Integrated 5GW Solar Cell Manufacturing — under environmental review, 3.9 km away
- Integrated 5GW Solar Cell Manufacturing — environmental approval granted, 3.9 km away
- Industrial Park at Allikulam, Keelathattaparai, Perurani, Umarikottai,… — environmental approval granted, 4.1 km away
- Industrial Park at Allikulam, Keelathattaparai, Perurani, Umarikottai,… — cleared for impact study, 4.1 km away
More from Nlc Tamilnadu Power Limited in Thoothukkudi
- Power project by NLC Tamil Nadu Power Limited — returned to applicant
All 3 Nlc Tamilnadu Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.