Quick answers
What is Integrated 5GW Solar Cell Manufacturing?
Integrated 5GW Solar Cell Manufacturing is a proposed industrial building project in Terku Virapandiyapuram, Ottapidaram, Thoothukkudi, Tamil Nadu. It plans 22 towers of up to 4 floors on 70.7 acres.
Who is building it?
The applicant is Zetsol Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Terku Virapandiyapuram, Ottapidaram, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹4,168 crore and a site of 70.7 acres.
When was it filed?
The application was filed on 30 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Integrated 5GW Solar Cell Manufacturing
Project details
| Official title | Integrated 5GW Solar Cell Manufacturing along with associated utilities Building at Thoothukudi SIPCOT, Tamil Nadu |
|---|---|
| Status | Under environmental review |
| Status since | 18 Nov 2026 |
| Application filed | 30 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Zetsol Energy Private Limited |
| Use | Industrial |
| Towers | 22 |
| Floors (tallest) | 4 |
| Height | 15 m |
| Parking spaces | 242 |
| Land area | 70.7 acres (28.6 ha) |
| Built-up area | 1,45,007 m² (15,60,841 sq ft) |
| Plot area | 2,85,829 m² (30,76,635 sq ft) |
| Project cost | ₹4,168 crore |
| Village / locality | Terku Virapandiyapuram |
| Taluk / tehsil | Ottapidaram |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-07006 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 30 Oct 2026 (this page) | Under environmental review | 70.7 acres | ₹4,168 crore |
| New project filed 4 Jul 2026 | Environmental approval granted | 70.7 acres | ₹4,151.4 crore |
In context
27 applications in Thoothukkudi since January 2022 are in the same category (Buildings & townships): 12 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 70.7 acres, this one is larger than 65% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Terku Virapandiyapuram, Ottapidaram, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated 5GW Solar Cell Manufacturing — environmental approval granted, 0 m away
- Proposed Expansion of Particle Board Manufacturing Plant by Xylosuisse Private… — environmental approval granted, 500 m away
- Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000… — environmental approval granted, 1.7 km away
- Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000… — cleared for impact study, 1.7 km away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — environmental approval granted, 1.8 km away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — under environmental review, 1.8 km away
- Proposed Rough Stone & Gravel Quarry of Thiru. B.Ayyadurai — environmental approval granted, 2.8 km away
- Proposed Expansion of Activated Carbon and Allied products from 45 to 69.2… — environmental approval granted, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.