Quick answers
What is Power project by NLC Tamil Nadu Power Limited?
This proposed power project by NLC Tamil Nadu Power Limited is in Mel Pandiyapuram, Ottapidaram, Thoothukkudi, Tamil Nadu. The site covers 601.6 acres.
Who is building it?
The applicant is Nlc Tamilnadu Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Mel Pandiyapuram, Ottapidaram, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹7,293.5 crore and a site of 601.6 acres.
When was it filed?
The application was filed on 16 Apr 2026.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 11 May 2026 |
| Application filed | 16 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Nlc Tamilnadu Power Limited |
| Land area | 601.6 acres (243.5 ha) |
| Project cost | ₹7,293.5 crore |
| Village / locality | Mel Pandiyapuram |
| Taluk / tehsil | Ottapidaram |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05040 |
In context
15 applications in Thoothukkudi since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 601.6 acres, this one is smaller than 77% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mel Pandiyapuram, Ottapidaram, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power project by Nlc Tamilnadu Power Limited — environmental approval granted, 0 m away
- Power project by Nlc Tamilnadu Power Limited — environmental approval granted, 0 m away
- P. Ananthakumar Rough Stone and Gravel Quarry Project Extent: 3.86.0ha… — environmental approval granted, 3.1 km away
- P. Ananthammal Rough Stone and Gravel Quarry Extent: 1.62.0ha S.F.No. 457/5 of… — environmental approval granted, 3.2 km away
- Integrated 5GW Solar Cell Manufacturing — under environmental review, 3.9 km away
- Integrated 5GW Solar Cell Manufacturing — environmental approval granted, 3.9 km away
- Industrial Park at Allikulam, Keelathattaparai, Perurani, Umarikottai,… — environmental approval granted, 4.1 km away
- Industrial Park at Allikulam, Keelathattaparai, Perurani, Umarikottai,… — cleared for impact study, 4.1 km away
More from Nlc Tamilnadu Power Limited in Thoothukkudi
- Power project by Nlc Tamilnadu Power Limited — environmental approval granted
- Power project by Nlc Tamilnadu Power Limited — environmental approval granted
All 3 Nlc Tamilnadu Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.