Project details
| Official title | EC & CRZ Amendment for the revised route alignment of seawater pipelines and coal pipe conveyance system (Conveyance Corridor) of 2x660 MW Ennore SEZ coal-based Supercritical Thermal Power project at Voyalur village, Ponneri Taluk, Tiruvallur District, Tamil Nādu |
|---|---|
| Status | Returned to applicant |
| Status since | 13 Nov 2023 |
| Application filed | 17 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Tangedco |
| Project cost | ₹950 crore |
| Village / locality | Ennur |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01140 |
In context
14 applications in Thiruvallur since January 2022 are in the same category (Power): 3 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ennur, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (4.9 km away).
Other projects nearby
- EC & CRZ Amendment for the revised route alignment of seawater pipelines and… — withdrawn, 0 m away
- Capacity Optimisation of the Operational Ennore Coal Terminal Pvt Ltd at… — environmental approval granted, 850 m away
- Capacity Optimisation of Operational Ennore Coal Terminal Private Limited… — environmental approval granted, 1.5 km away
- Ennore Port Expansion Proposal - 'Development of Terminals for Marine Liquids,… — environmental approval granted, 1.5 km away
- Capacity Optimisation of Operational Ennore Coal Terminal Private Limited… — environmental approval granted, 1.5 km away
- Expansion and Modernization of existing Multi cargo Container Terminal at… — environmental approval granted, 1.5 km away
- Change in Cargo Profile of the Operational Ennore Bulk Terminal Pvt. Ltd.,… — environmental approval granted, 1.5 km away
- Change in Cargo Profile of the Operational Ennore Bulk Terminal Pvt. Ltd.,… — withdrawn, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.