Project details
| Official title | EC & CRZ Amendment for the revised route alignment of seawater pipelines and coal pipe conveyance system (Conveyance Corridor) of 2x660 MW Ennore SEZ coal-based Supercritical Thermal Power project at Voyalur village, Ponneri Taluk, Tiruvallur District, Tamil Nādu |
|---|---|
| Status | Withdrawn |
| Status since | 9 Jan 2024 |
| Application filed | 4 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Tamil Nadu Power Generation Corporation Limited |
| Project cost | ₹950 crore |
| Village / locality | Ennur |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00559 |
In context
14 applications in Thiruvallur since January 2022 are in the same category (Power): 3 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ennur, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (4.9 km away).
Other projects nearby
- EC & CRZ Amendment for the revised route alignment of seawater pipelines and… — returned to applicant, 0 m away
- Capacity Optimisation of the Operational Ennore Coal Terminal Pvt Ltd at… — environmental approval granted, 850 m away
- Capacity Optimisation of Operational Ennore Coal Terminal Private Limited… — environmental approval granted, 1.5 km away
- Ennore Port Expansion Proposal - 'Development of Terminals for Marine Liquids,… — environmental approval granted, 1.5 km away
- Capacity Optimisation of Operational Ennore Coal Terminal Private Limited… — environmental approval granted, 1.5 km away
- Expansion and Modernization of existing Multi cargo Container Terminal at… — environmental approval granted, 1.5 km away
- Change in Cargo Profile of the Operational Ennore Bulk Terminal Pvt. Ltd.,… — environmental approval granted, 1.5 km away
- Change in Cargo Profile of the Operational Ennore Bulk Terminal Pvt. Ltd.,… — withdrawn, 1.5 km away
More from Tamil Nadu Power Generation Corporation Limited in Thiruvallur
- 2X660 MW Ennore SEZ Thermal Power Plant by M/s. TNPGCL (Erstwhile TANGEDCO) — lapsed
- 2X660 MW Ennore SEZ Thermal Power Plant by M/s. TNPGCL ( Erstwhile TANGEDCO) — more information requested
- 1x 800 MW NCTPP Stage III by M/s. TNPGCL (Erstwhile TANGEDCO) — lapsed
- 2X660 MW Ennore SEZ Thermal Power Project by M/S. Tamil Nadu Power Generation… — lapsed
- Name Transfer Application Form — lapsed
- 2X660 MW Ennore SEZ Thermal Power Plant by M/s. TNPGCL ( Erstwhile TANGEDCO) — environmental approval granted
11 Tamil Nadu Power Generation Corporation projects in Chennai
All 17 Tamil Nadu Power Generation Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.