Quick answers
What is Roughstone Quarry of Thiru P.Palanisamy?
Roughstone Quarry of Thiru P.Palanisamy is an approved mining project in Veeralapatti, Oddanchatram, Dindigul, Tamil Nadu. The site covers 2.5 acres.
Who is building it?
The applicant is Palanichamy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Aug 2023), as of 27 Nov 2026.
Where is it?
In Veeralapatti, Oddanchatram, Dindigul, Tamil Nadu.
How big is it?
It has a stated cost of ₹30 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 16 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Aug 2023 |
| Application filed | 16 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Palanichamy |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Veeralapatti |
| Taluk / tehsil | Oddanchatram |
| District | Dindigul |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01147 |
In context
185 applications in Dindigul since January 2022 are in the same category (Mining): 121 approved, 36 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 6.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Veeralapatti, Oddanchatram, Dindigul, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Rough Stone Quarry of Thiru.P.Balakarthick — environmental approval granted, 100 m away
- Rough stone quarry of Thiru K.Rajaram — more information requested, 2.4 km away
- The Executive Engineer (Public Works Department / Water Resources Department -… — environmental approval granted, 5.4 km away
- Permission to remove desilting in Parappalar Dam IN DINDIGUL DISTRICT — forest land use approved, 5.6 km away
- Permission to remove desilting in Parappalar Dam IN DINDIGUL DISTRICT — lapsed, 5.6 km away
- Laying of Overhead OFC cable in Periyur - Pachalur Section across Mulaiyar RF… — lapsed, 12.8 km away
- Laying of Overhead OFC cable in Periyur - Pachalur Section across Mulaiyar RF… — lapsed, 12.8 km away
- Laying of Underground OFC in Periyur - Pachalur Section across Mulaiyar RF -… — lapsed, 13.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.