Quick answers
What is Rough Stone and Gravel Quarry of Thiru. A. Paulraj?
Rough Stone and Gravel Quarry of Thiru. A. Paulraj is an approved mining project in Kurukkampatti, Vembakottai, Virudhunagar, Tamil Nadu. The site covers 4.5 acres.
Who is building it?
The applicant is Arumugam Paulraj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Jul 2023), as of 27 Nov 2026.
Where is it?
In Kurukkampatti, Vembakottai, Virudhunagar, Tamil Nadu.
How big is it?
It has a stated cost of ₹68 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 15 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Jul 2023 |
| Application filed | 15 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arumugam Paulraj |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Kurukkampatti |
| Taluk / tehsil | Vembakottai |
| District | Virudhunagar |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01148 |
In context
207 applications in Virudhunagar since January 2022 are in the same category (Mining): 152 approved, 34 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.5 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kurukkampatti, Vembakottai, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. S.Murugesan — environmental approval granted, 3.9 km away
- Rough Stone and Gravel Quarry of Thiru. S.Murugesan — environmental approval granted, 3.9 km away
- Proposed Rough Stone & Gravel Quarry of Thiru.B.Kabildev — environmental approval granted, 4.4 km away
- Proposed Rough Stone & Gravel Quarry of Thiru.B.Kabildev — cleared for impact study, 4.4 km away
- Rough Stone and Gravel Quarry of Thiru S. Shunmugavel — lapsed, 4.6 km away
- Rough Stone and Gravel Quarry of Thiru S. Shunmugavel — cleared for impact study, 4.6 km away
- Rough Stone and Gravel Quarry of Thiru. S. Devaraj — cleared for impact study, 4.8 km away
- Thiru. A.Seethakumar Rough Stone and Gravel Quarry — under environmental review, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.